Analyzing material management techniques on construction project AR Patil, SV Pataskar International Journal of Engineering and Innovative Technology 3 (4), 96-100, 2013 | 118 | 2013 |
Use of porous concrete as a green construction material for pavement SS Ganpule, SV Pataskar International Journal of Earth Sciences and Engineering 4 (06), 764-767, 2011 | 22 | 2011 |
Ergonomics Risk Assessment of Musculoskeletal Disorder on Construction Site TR Vachhani, SK Sawant, S Pataskar Journal of Civil Engineering and Environmental Technology 3 (3), 228-231, 2016 | 21 | 2016 |
Applying six sigma principles in construction industry for quality improvement SP Sawant, SV Pataskar Int J Sci Eng Res 117 (4), 129-139, 2014 | 21 | 2014 |
Life cycle cost analysis of a multi storied residential building R Mahajan, SV Pataskar, NS Jain Int. J. Mech. Prod. Eng 2, 46-49, 2014 | 9 | 2014 |
Implementation of line of balance method for scheduling high-rise building H Talodhikar, S Pataskar J Eng Res Appl 5 (3), 9-12, 2015 | 6 | 2015 |
Cost and time optimization for construction of residential building by clash detection in building information model (BIM) BG Shyamkant, A Patil, S Pataskar Int. Res. J. Eng. Technol 4 (01), 2017 | 5 | 2017 |
Evaluation of noise and incurred social cost due to infrastructure construction activity JZ Shah, SV Pataskar Int. J. Sci. Technol. Res 8, 1612-1616, 2019 | 4 | 2019 |
Schedule Performance of Residential Project by using Weibull Analysis AG Charbhe, AA Suryavanshi, S Pathak, SV Pataskar International Journal for Science and Advance Research in Technology 3 (1 …, 2017 | 3 | 2017 |
Life Cycle Cost Analysis of Bituminous Pavements and Concrete Pavements in Urban Areas SP Ashok, AR Patil, SV Pataskar ISSN IJSART 3, 2017 | 2 | 2017 |
An Assessment of Factors Affecting on Buyer–Supplier Relationship Management (BSRM) in Construction Industry S Kharade, S Pataskar International Journal Of Commerce & Business Studies 4 (2), 1-12, 2016 | 2 | 2016 |
Quality Management In Construction Industry By Using Building Information Modelling (BIM) MRN Holkar, MS Pataskar J. Univ. Shanghai Sci. Technol 23, 265-276, 2021 | 1 | 2021 |
Development of Empirical Equation to Estimate Corridor Speed of Vehicles in Metro Construction Work Zone P Smita, P Sunil, D Chaitanya LOGI – Scientific Journal on Transport and Logistics 15 (1), 25-36, 2024 | | 2024 |
An Analysis of the Cost Associated with Diversions Caused by Metro Rail Construction Work CD Darekar, SV Pataskar, SS Pimplikar International Conference on Interdisciplinary Approaches in Civil …, 2023 | | 2023 |
Study Of Correlation Between Non-Recurring Delay Factors And Speed On Road Construction Work Zone S PATASKAR, S PIMPLIKAR, C DAREKAR Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering 45 (6), 40-49, 2023 | | 2023 |
STUDY OF SFRC AND DESIGNING WATER TANK USING STAAD. PRO SOFTWARE S Pataskar, G Shinde, G Patil, S Pillai | | 2021 |
Study of Indirect Traffic Parameters Along Metro Construction Route S Pataskar, S Pimplikar International Conference on Smart Technologies for Energy, Environment, and …, 2020 | | 2020 |
Financial Feasibility Study on a Redevelopment Residential High Rise Building S Sable, S Pataskar, A Patil | | 2020 |
Evaluation Of Travel Delay Cost Associated With The Traffic In Metro-Infrastructure Project MK Nawhal, SV Pataskar International Journal of Scientific & Technology Research 8 (8), 125-130, 2019 | | 2019 |
Performance Management System in Construction PA Vadnal, S Pataskar | | |