Numerical simulation of coal pillar strength A Jaiswal, BK Shrivastva International Journal of Rock Mechanics and Mining Sciences 46 (4), 779-788, 2009 | 218 | 2009 |
Application of geogrids in waste dump stability: a numerical modeling approach R Rai, M Khandelwal, A Jaiswal Environmental Earth Sciences 66, 1459-1465, 2012 | 40 | 2012 |
Numerical modeling study of asymmetry in the induced stresses over coal mine pillars with advancement of the goaf line A Jaiswal, SK Sharma, BK Shrivastva International journal of rock mechanics and mining sciences 41 (5), 859-864, 2004 | 37 | 2004 |
A generalized three-dimensional failure criterion for rock masses A Jaiswal, BK Shrivastva Journal of Rock Mechanics and Geotechnical Engineering 4 (4), 333-343, 2012 | 35 | 2012 |
Stability analysis of the proposed hybrid method of partial extraction for underground coal mining A Jaiswal, BK Shrivastva International Journal of Rock Mechanics and Mining Sciences 52, 103-111, 2012 | 34 | 2012 |
Sensitivity analysis of coal rib stability for internal mine dump in opencast mine by finite element modelling T Gupta, R Rai, A Jaiswal, BK Shrivastva Geotechnical and Geological Engineering 32, 705-712, 2014 | 24 | 2014 |
Stability evaluation of dump slope using artificial neural network and multiple regression AK Bharati, A Ray, M Khandelwal, R Rai, A Jaiswal Engineering with Computers 38 (Suppl 3), 1835-1843, 2022 | 21 | 2022 |
Estimation of Modulus of the Caved Rock for Underground Coal Mines by Back Analysis using Numerical Modelling P Garg, A Jaiswal Journal of The Institution of Engineers (India): Series D, 1-5, 2015 | 10 | 2015 |
Design of Snook in Depillaring Panel Using Continuous Miner S Chawla, A Jaiswal, BK Shrivastva Journal of The Institution of Engineers (India): Series D, 1-11, 2017 | 6 | 2017 |
Proposed hybrid method of partial extraction A Jaiswal, BK Shrivastva CSIR, 2009 | 5 | 2009 |
Numerical study of pillars behavior in continuous miner depillaring panel: a case study S Chawla, A Jaiswal, BK Shrivastva Mining, Metallurgy & Exploration 39 (4), 1537-1552, 2022 | 4 | 2022 |
Estimation of rock load height during development operation in bord and pillar coal mine using numerical simulation method R Hasim, A Jaiswal, BK Shrivastava AMSE Press, 2018 | 4 | 2018 |
Design of remnant pillar in mechanized depillaring using continuous miner. S Chawla, A Jaiswal, BK Shrivastva Journal of Mines, Metals & Fuels 69 (2), 2021 | 2 | 2021 |
Analysis of laminated Roof with Rock Bolt Using Numerical Simulation Method R Hasim, A Jaiswal, BK Shrivastva The Indian Mining & Engineering Journal 56 (10), 19-24, 2017 | 2 | 2017 |
Numerical simulation of roof bolt system during depillaring operation in bord and pillar panel H Rizwan, J Ashok, S BK International Conference on Recent Advances in Rock Engineering, Bengaluru …, 2016 | 2 | 2016 |
A novel approach for the assessment of caving behaviour in a bord and pillar depillaring panel by using continuum modelling PR Gadepaka, A Jaiswal International Journal of Rock Mechanics and Mining Sciences 170, 105476, 2023 | 1 | 2023 |
Support design during depillaring operation in bord and pillar panel using numerical simulation method R Hasim, A Jaiswal, BK Shrivastva AMSE J-AMSE IIETA Publ 78, 351-363, 2018 | 1 | 2018 |
Slope Stability Analysis Using Radial Slices: A Mathematical Model GP Kumar, A Das, R Rai, A Jaiswal Journal of The Institution of Engineers (India): Series D 96, 189-193, 2015 | 1 | 2015 |
Methodology for analysis of socketed piles in weathered rock in Mumbai region A Jaiswal, PA Dode, NS Kapse, HS Chore International Journal of Computer Applications 975, 8887, 2015 | 1 | 2015 |
A Simple 3D Hoek and Brown Failure Criterion A Jaiswal, R Thareja Indian Geotechnical Journal 42, 113-117, 2012 | 1 | 2012 |