Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs S Thiagarajan, C Rajendran Computers & Industrial Engineering 49 (4), 463-503, 2005 | 124 | 2005 |
Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs S Thiagarajan, C Rajendran International Journal of Production Research 41 (18), 4453-4486, 2003 | 50 | 2003 |
Performance enhancement by using non-permutation schedules in flowline-based manufacturing systems S Pugazhendhi, S Thiagarajan, C Rajendran, N Anantharaman Computers & Industrial Engineering 44 (1), 133-157, 2003 | 44 | 2003 |
Generating non-permutation schedules in flowline-based manufacturing sytems with sequence-dependent setup times of jobs: a heuristic approach S Pugazhendhi, S Thiagarajan, C Rajendran, N Anantharaman The International Journal of Advanced Manufacturing Technology 23, 64-78, 2004 | 43 | 2004 |
Relative performance evaluation of permutation and non-permutation schedules in flowline-based manufacturing systems with flowtime objective S Pugazhendhi, S Thiagarajan, C Rajendran, N Anantharaman The International Journal of Advanced Manufacturing Technology 23, 820-830, 2004 | 19 | 2004 |
Simulated annealing algorithms to minimise the completion time variance of jobs in permutation flowshops J Krishnaraj, S Pugazhendhi, C Rajendran, S Thiagarajan International Journal of Industrial and Systems Engineering 31 (4), 425-451, 2019 | 13 | 2019 |
A modified ant-colony optimisation algorithm to minimise the completion time variance of jobs in flowshops J Krishnaraj, S Pugazhendhi, C Rajendran, S Thiagarajan International journal of production research 50 (20), 5698-5706, 2012 | 8 | 2012 |
A heuristic algorithm to minimise the total flowtime of jobs in permutation flowshops J Krishnaraj, S Pugazhendhi, C Rajendran, S Thiagarajan International Journal of Industrial and Systems Engineering 17 (4), 511-532, 2014 | 6 | 2014 |
A two-phase simulated annealing algorithm to minimise the completion time variance of jobs in flowshops J Krishnaraj, S Thiagarajan International Journal of Process Management and Benchmarking 10 (2), 261-281, 2020 | 3 | 2020 |