Follow
Milad Baghalzadeh Shishehgarkhaneh
Milad Baghalzadeh Shishehgarkhaneh
Verified email at monash.edu - Homepage
Title
Cited by
Cited by
Year
Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in construction industry: A review, bibliometric, and network analysis
M Baghalzadeh Shishehgarkhaneh, A Keivani, RC Moehler, N Jelodari, ...
Buildings 12 (10), 1503, 2022
952022
Energy valley optimizer: a novel metaheuristic algorithm for global and engineering optimization
M Azizi, U Aickelin, H A. Khorshidi, M Baghalzadeh Shishehgarkhaneh
Scientific Reports 13 (1), 226, 2023
512023
Shape and size optimization of truss structures by Chaos game optimization considering frequency constraints
M Azizi, U Aickelin, HA Khorshidi, MB Shishehgarkhaneh
Journal of Advanced Research 41, 89-100, 2022
322022
BIM-based resource tradeoff in project scheduling using fire hawk optimizer (FHO)
MB Shishehgarkhaneh, M Azizi, M Basiri, RC Moehler
Buildings 12 (9), 1472, 2022
302022
Optimal design of low-and high-rise building structures by Tribe-Harmony Search algorithm
M Azizi, S Talatahari, M Basiri, MB Shishehgarkhaneh
Decision Analytics Journal 3, 100067, 2022
212022
Optimum design of truss structures by Material Generation Algorithm with discrete variables
M Azizi, MB Shishehgarkhaneh, M Basiri
Decision Analytics Journal 3, 100043, 2022
202022
Optimization of large-scale frame structures using fuzzy adaptive quantum inspired charged system search
S Talatahari, M Azizi, M Toloo, M Baghalzadeh Shishehgarkhaneh
International journal of steel structures 22 (3), 686-707, 2022
202022
Blockchain in the Construction Industry between 2016 and 2022: A Review, Bibliometric, and Network Analysis
MB Shishehgarkhaneh, RC Moehler, SF Moradinia
Smart Cities 6 (2), 819-845, 2023
152023
Squid Game Optimizer (SGO): a novel metaheuristic algorithm
M Azizi, M Baghalzadeh Shishehgarkhaneh, M Basiri, RC Moehler
Scientific reports 13 (1), 5373, 2023
132023
Application of classic and novel metaheuristic algorithms in a BIM-based resource Tradeoff in dam projects
M Baghalzadeh Shishehgarkhaneh, SF Moradinia, A Keivani, M Azizi
Smart Cities 5 (4), 1441-1464, 2022
112022
Toward nearly zero energy building designs: a comparative study of various techniques
AH Daqiqnia, S Fard Moradinia, M Baghalzadeh Shishehgarkhaneh
AUT Journal of Civil Engineering 5 (2), 339-356, 2021
112021
Optimum design of truss structures with atomic orbital search considering discrete design variables
M Azizi, AW Mohamed, MB Shishehgarkhaneh
Handbook of Nature-Inspired Optimization Algorithms: The State of the Art …, 2022
92022
Internet of Things (IoT)
MB Shishehgarkhaneh, A Keivani, RC Moehler, N Jelodari, SR Laleh
Building Information Modeling (BIM), and Digital Twin (DT) in Construction …, 2022
82022
Time and Cost Management of Dam Construction Projects based on Building Information Modeling (BIM) (A Case Study in Kurdistan Province)
M Baghalzadeh Shishehgarkhaneh, S Fard Moradinia, A Keivani
7th International Congress on Civil Engineering, Architecture and Urban …, 2022
82022
The role of Building Information Modeling (BIM) in reducing the number of project dispute resolution sessions
M Baghalzadeh Shishehgarkhaneh, S Fard Moradinia
The 8th National Conference on Civil Engineering, Architecture and …, 2020
72020
Design Optimization of Truss Structures by Crystal Structure Algorithm
M Azizi, MB Shishehgarkhaneh, M Basiri
52022
Fire Hawk Optimizer for Resource Trade-off in Project Scheduling based on BIM
MB Shishehgarkhaneh, M Azizi, M Basiri, R Moehler
Preprints, 2022
32022
Exploring the Impact of Social Media Use on Team Feedback and Team Performance in Construction Projects: A Systematic Literature Review
R Karimi, M Baghalzadeh Shishehgarkhaneh, RC Moehler, Y Fang
Buildings 14 (2), 528, 2024
22024
Hybrid Social Network Search and Material Generation Algorithm for Shape and Size Optimization of Truss Structures
M Saraee, A Jafari, D Yazdani, MB Shishehgarkhaneh, B Nouhi, ...
Hybrid Metaheuristics in Structural Engineering: Including Machine Learning …, 2023
22023
Construction supply chain risk management
MB Shishehgarkhaneh, RC Moehler, Y Fang, H Aboutorab, AA Hijazi
Automation in Construction 162, 105396, 2024
12024
The system can't perform the operation now. Try again later.
Articles 1–20