Time, cost and quality trade-off analysis in construction of projects NR Shankar, MMK Raju, G Srikanth, PH Bindu Contemporary Engineering Sciences 4 (6), 289-299, 2011 | 37 | 2011 |
DISCRETE TIME,COST AND QUALITY TRADE-OFF PROBLEM WITH RENEWABLE AND NON-RENEWABLE RESOURCES DPH Bindu INTERNATIONAL JOURNAL OF COMPUTATIONAL SCIENCES AND MATHEMATICS 2 (1), 285-290, 2010 | 6 | 2010 |
A NEW METHOD FOR ASSESSMENT OF COLLEGES BY NAAC/NBA CRITERIA BASED ON ROUGH SET THEORY DPR Dr. P Hima Bindu International Journal for Research in Engineering Application & Management …, 2019 | | 2019 |
Engineering Mathematics-III DPH Bindu Cengage Learning India Pvt.Ltd 1, 1-300, 2016 | | 2016 |
Approach of Crashing Critical Activity (CCA) and Stretching Non-critical Activities (SNA) of Time Cost Trade off problems using Critical Path Method PH Bindu International Journal of Scientific and Research Publications, 107, 2015 | | 2015 |
ROLE OF CHROMATIC NUMBERS IN GRAPH THEORY DPH Bindu INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 4 (9 …, 2015 | | 2015 |
EFFECT OF ECONOMIC CONSTRAINT ON TIME COST TRADE -OFF PROBLEM IN PROJECT SCHEDULING DPH Bindu INTERNATIONAL JOURNAL OF MATHEMATICAL ARCHIVE 3 (9), 1-7, 2012 | | 2012 |
INTRODUCTION TO COMPUTABILITY THEORY AND TURING MACHINES DPH Bindu JOURNAL OF RESEARCH STUDIES 9 (8), 38 - 42, 2008 | | 2008 |
TYPES OF GRAPH COLORING AND APPLICATIONS DPH Bindu Compendium of Study Circle Lectures 8 (7), 98-108, 2007 | | 2007 |
INTRODUCTION TO GRAPH THEORY DPH Bindu Compendium of Study Circle 7 (6), 92-99, 2005 | | 2005 |
SAMPLING TECHNIQUES DPH Bindu Compendium of Study Circle 6 (5), 39-54, 2003 | | 2003 |
PERT analysis and Simulation of Project based on PERT DPH Bindu Compendium of Study Circle Lectures 5 (4), 92-99, 2002 | | 2002 |
An effective object tracking detection system using Bayesian Monte Carlo Employing Particle Gaussian Information Filter DKS Dr. P. Hima Bindu International Journal of Advance Robotics & Expert Systems (JARES), 0 | | |
Minimum Cut in the Project Network to Solve Time Cost Trade-Off Problem Using Renewable and Non Renewable Resources PH Bindu | | |
EFFECT OF FINANCIAL CONSTRAINT ON THE TIME COST TRADE-OFF PROBLEMS USING RENEWABLE & NON-RENEWABLE RESOURCES PH Bindu | | |