Follow
Kyungsu Park
Title
Cited by
Cited by
Year
Persistent UAV delivery logistics: MILP formulation and efficient heuristic
BD Song, K Park, J Kim
Computers & Industrial Engineering 120, 418-428, 2018
2262018
Controlled wafer release in clustered photolithography tools: Flexible flow line job release scheduling and an LMOLP heuristic
K Park, JR Morrison
IEEE Transactions on Automation Science and Engineering 12 (2), 642-655, 2015
282015
Improving productivity of a multi-product machining line at a motorcycle manufacturing plant
K Park, J Li
International Journal of Production Research 57 (2), 470-487, 2019
242019
Redesign of reverse logistics network with managerial decisions on the minimum quality level and remanufacturing policy
K Park, J Kim, YD Ko, BD Song
Journal of the Operational Research Society 72 (7), 1564-1577, 2021
222021
Scheduling policies in flexible Bernoulli lines with dedicated finite buffers
K Park, J Li, SC Feng
Journal of manufacturing systems 48, 33-48, 2018
202018
Toward flexible and persistent UAV service: Multi-period and multi-objective system design with task assignment for disaster management
BD Song, H Park, K Park
Expert Systems with Applications 206, 117855, 2022
132022
Control of wafer release in multi cluster tools
K Park, JR Morrison
IEEE ICCA 2010, 1481-1487, 2010
112010
Models of clustered photolithography tools for fab-level simulation: From affine to flow line
JY Park, K Park, JR Morrison
IEEE Transactions on Semiconductor Manufacturing 30 (4), 547-558, 2017
102017
Theme park revenue management with a dual admission policy
YD Ko, K Park
Asia Pacific Journal of Tourism Research 24 (9), 865-881, 2019
92019
Performance evaluation of deterministic flow lines: Redundant modules and application to semiconductor manufacturing equipment
K Park, JR Morrison
2010 IEEE International Conference on Automation Science and Engineering, 45-50, 2010
92010
Exit Recursion Models of Clustered Photolithography Tools for Fab Level Simulation
JY Park, K Park, JR Morrison
IEEE Transactions on Semiconductor Manufacturing 30 (1), 39-51, 2017
62017
Cluster tool design comparisons via simulation
K Park, JR Morrison
Proceedings of the 2011 Winter Simulation Conference (WSC), 1872-1882, 2011
52011
Performance models for dual-arm cluster tools
K Park, Y Ahn, JR Morrison
2011 9th World Congress on Intelligent Control and Automation, 816-821, 2011
52011
Performance evaluation of deterministic flow lines considering multiclass customer and random setups
W Kim, K Park
Journal of Manufacturing Systems 53, 109-123, 2019
42019
Performance bounds for hybrid flow lines: Fundamental behavior, practical features and application to linear cluster tools
K Park, JR Morrison
2012 IEEE International Conference on Automation Science and Engineering …, 2012
22012
Wafer admission control for clustered photolithography tools
K Park, JR Morrison
2010 IEEE/SEMI Advanced Semiconductor Manufacturing Conference (ASMC), 220-225, 2010
22010
Performance models of multi-stage Bernoulli lines with multiple product and dedicated buffers
K Park, JH Han, WS Kim
한국산업경영시스템학회지 44 (3), 22-32, 2021
12021
Efficient food service chain management considering substitute products
YD Ko, BD Song, K Park
Asia Pacific Journal of Marketing and Logistics 33 (2), 667-685, 2021
12021
Optimal Use of ISR Assets for Detecting Time-Sensitive Targets Incorporating Satellites in Missile Defense Operations
J Kim, W Kim, K Park, BD Song
Military Operations Research 25 (1), 23-34, 2020
12020
Scheduling wafer release in clustered photolithography tools
K Park, JR Morrison
Proc. 5th Multidisciplinary Int. Scheduling Conf.(MISTA'11), 639-641, 2011
12011
The system can't perform the operation now. Try again later.
Articles 1–20