Follow
Dr.Nageswara Rao Medikondu
Dr.Nageswara Rao Medikondu
K L E F Deemed to be University
Verified email at kluniversity.in - Homepage
Title
Cited by
Cited by
Year
Simultaneous scheduling of machines and AGVs in flexible manufacturing system with minimization of tardiness criterion
M Nageswararao, K Narayanarao, G Ranagajanardhana
Procedia Materials Science 5, 1492-1501, 2014
572014
Scheduling of AGVs and machines in FMS with makespan criteria using sheep flock heredity algorithm
MNRKNR K. V. Subbaiah 1
International Journal of Physical Sciences 4 (2), 139-148, 2009
552009
SIMULTANEOUS SCHEDULING IN FMS THROUGH PRIORITY RULES
MNRCSBYVKLVHV Kumari. S
Journal of Advanced Research in Dynamical and Control Systems 9 (17), 1995-2008, 2018
31*2018
Experimental investigation and multi-objective optimization of eco-friendly near-dry electrical discharge machining of shape memory alloy using Cu/SiC/Gr composite electrode
NV Gowri, JN Dwivedi, K Krishnaveni, S Boopathi, M Palaniappan, ...
Environmental Science and Pollution Research 30 (49), 107498-107516, 2023
302023
SCHEDULING OF MACHINES AND AUTOMATED GUIDED VEHICLES IN FMS USING SHUFFLED FROG LEAP ALGORITHM
GJK Medikondu Nageswararao, Makkena Naveenkumar, Majety Vamshimohan
International Journal of Mechanical Engineering and Technology (IJMET) 8 (5 …, 2017
30*2017
Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS
VVBNRM K. Prakash Babua,b
Management Science Letters 8 (6), 543–554, 2018
282018
INTEGRATED SCHEDULING OF MACHINES AND AGVS IN FMS BY USING DISPATCHING RULES
JG Nageswara, Rao.M., Narayana, Rao.K.., Ranga
Journal of Production Engineering 20 (1), 75-84, 2017
282017
Scheduling of machines and automated guided vehicles in FMS using gravitational search algorithm
M Nageswararao, K Narayanarao, G Rangajanardhana
Applied Mechanics and Materials 867, 307-313, 2017
272017
Application of BPSO in flexible manufacturing system scheduling
MN Rao, DH Krishna, P Triyaplus, P Vivekananda, M Chanukya, ...
International Journal of Mechanical Engineering and Technology 8 (5), 186-195, 2017
252017
SCHEDULING OF MACHINES AND AUTOMATED GUIDED VEHICLES IN FMS USING SCATTER SEARCH ALGORITHM
MMKVB P Anil Kumar, M Nageswararao,T Yeswanth Kumar
International Journal of Mechanical Engineering and Technology (IJMET) 8 (5 …, 2017
25*2017
Simultaneous Scheduling of Machines and AGVs in FMS through Simulated Annealing Algorithm
M. Nageswara Rao, Vara Kumari S., Praneeth I., Gaya Prasad K.,D. Maheshwar ...
International Journal of Innovative Technology and Exploring Engineering …, 2020
22*2020
Simultaneous Scheduling of Machines and AGVs in FMS Through Ant Colony Optimization Algorithm
RSKS M. Nageswara Rao, S. Vara Kumari, P. Manohar, B. Madesh, P. Naveen Krishna
International Journal of Engineering and Advanced Technology (IJEAT) 9 (3 …, 2020
21*2020
Simultaneous scheduling through heuristic algorithm
M Nageswara Rao, K Lokesh, V Harish, CH Sai Bharath, Y Venkatesh, ...
Int. J. Eng. Technol 7 (2.32), 125-130, 2018
202018
Machines and AGVs Scheduling in Flexible Manufacturing System with Mean Tardiness Criterion
DKNDGR MedikonduNageswararao
International journal of Advanced Materials Manufacturing …, 2014
202014
Operational control decisions through random rule in flexible manufacturing system
K Sai Sandeep, M Nageswara Rao, K Rakesh, D Phanindra Kshatra, ...
Technology Innovation in Mechanical Engineering: Select Proceedings of TIME …, 2022
192022
Scheduling of Machines and AGVs Simultaneously in FMS through Hybrid Teaching Learning Based Optimization Algorithm
NRM Prakash Babu Kanakavalli, Vijaya Babu Vommi
International Journal of Engineering and Advanced Technology (IJEAT) 9 (2 …, 2019
19*2019
Mean tardiness with heuristic in intelligent manufacturing system
M Nageswara Rao, T Vijaya Kumar, K Prakash Babu, GR Sanjay Krishna, ...
Technology Innovation in Mechanical Engineering: Select Proceedings of TIME …, 2022
182022
Modrak Algorithm to Minimize Completion Time for n-Jobs m-Machines Problem in Flexible Manufacturing System
VKS Dr.M.Nageswara Rao, K.Dileep, Shaik Khadar Basha
International Journal of Emerging Trends in Engineering Research 8 (8), 4560 …, 2020
182020
Simultaneous scheduling with JND Gupta heuristic algorithm with mean tardiness
M Nageswara Rao, K Prakash Babu, T Vijaya Kumar, S Kumar Malyala, ...
Technology Innovation in Mechanical Engineering: Select Proceedings of TIME …, 2022
172022
Flexible manufacturing system simultaneous scheduling through Palmer heuristic algorithm
M Nageswara Rao, K Prakash Babu, KK Dama, SK Malyala, ...
Technology Innovation in Mechanical Engineering: Select Proceedings of TIME …, 2022
172022
The system can't perform the operation now. Try again later.
Articles 1–20