Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain C Moon, J Kim, S Hur Computers & Industrial Engineering 43 (1-2), 331-349, 2002 | 264 | 2002 |
The effect of different arrival rates on the N-policy of M/G/1 with server setup S Hur, SJ Paik Applied Mathematical Modelling 23 (4), 289-299, 1999 | 88 | 1999 |
Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model B Sarkar, S Saren, D Sinha, S Hur Mathematical Problems in Engineering 2015, 2015 | 79 | 2015 |
Optimal design of rack structure with modular cell in AS/RS YH Lee, MH Lee, S Hur International Journal of Production Economics 98 (2), 172-178, 2005 | 62 | 2005 |
A performance estimation model for AS/RS by M/G/1 queuing system S Hur, YH Lee, SY Lim, MH Lee Computers & Industrial Engineering 46 (2), 233-241, 2004 | 62 | 2004 |
MR/GI/1 queues by positively correlated arrival stream R Szekli, RL Disney, S Hur Journal of Applied Probability 31 (2), 497-514, 1994 | 58 | 1994 |
An analysis of the M/G/1 system with N and T policy S Hur, J Kim, C Kang Applied Mathematical Modelling 27 (8), 665-675, 2003 | 49 | 2003 |
Batch arrival queues with vacations and server setup S Hur, S Ahn Applied Mathematical Modelling 29 (12), 1164-1181, 2005 | 45 | 2005 |
Efficient genetic algorithm for feature selection for early time series classification G Ahn, S Hur Computers & Industrial Engineering 142, 106345, 2020 | 43 | 2020 |
An analysis of the research methodologies and techniques in the industrial engineering using text mining GH Cho, SY Lim, S Hur Journal of Korean institute of industrial engineers 40 (1), 52-59, 2014 | 36 | 2014 |
Optimal replenishment decision for retailers with variable demand for deteriorating products under a trade-credit policy B Sarkar, BK Dey, M Sarkar, S Hur, B Mandal, V Dhaka RAIRO-Operations Research 54 (6), 1685-1701, 2020 | 35 | 2020 |
An algorithm for repairable item inventory system with depot spares and general repair time distribution JS Kim, TY Kim, S Hur Applied mathematical modelling 31 (5), 795-804, 2007 | 32 | 2007 |
Performance computation methods for composition of tasks with multiple patterns in cloud manufacturing G Ahn, YJ Park, S Hur International Journal of Production Research 57 (2), 517-530, 2019 | 27 | 2019 |
Performance analysis of automatic storage/retrieval systems by stochastic modelling S Hur, J Nam International journal of production research 44 (8), 1613-1626, 2006 | 26 | 2006 |
Departure process of a single server queueing system with Markov renewal input and general service time distribution SY Lim, S Hur, SJ Noh Computers & Industrial Engineering 51 (3), 519-525, 2006 | 21 | 2006 |
Development of indicator of data sufficiency for feature-based early time series classification with applications of bearing fault diagnosis G Ahn, H Lee, J Park, S Hur Processes 8 (7), 790, 2020 | 17 | 2020 |
Bayesian network model to diagnose WMSDs with working characteristics G Ahn, S Hur, MC Jung International journal of occupational safety and ergonomics, 2018 | 17 | 2018 |
Probabilistic graphical framework for estimating collaboration levels in cloud manufacturing G Ahn, YJ Park, S Hur Sustainability 9 (2), 277, 2017 | 16 | 2017 |
A membership probability–based undersampling algorithm for imbalanced data G Ahn, YJ Park, S Hur Journal of Classification 38 (1), 2-15, 2021 | 15 | 2021 |
Multiobjective real-time scheduling of tasks in cloud manufacturing with genetic algorithm G Ahn, S Hur Mathematical Problems in Engineering 2021, 2021 | 15 | 2021 |