Follow
Sun Hur
Sun Hur
Verified email at hanyang.ac.kr - Homepage
Title
Cited by
Cited by
Year
Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
C Moon, J Kim, S Hur
Computers & Industrial Engineering 43 (1-2), 331-349, 2002
2642002
The effect of different arrival rates on the N-policy of M/G/1 with server setup
S Hur, SJ Paik
Applied Mathematical Modelling 23 (4), 289-299, 1999
881999
Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model
B Sarkar, S Saren, D Sinha, S Hur
Mathematical Problems in Engineering 2015, 2015
792015
Optimal design of rack structure with modular cell in AS/RS
YH Lee, MH Lee, S Hur
International Journal of Production Economics 98 (2), 172-178, 2005
622005
A performance estimation model for AS/RS by M/G/1 queuing system
S Hur, YH Lee, SY Lim, MH Lee
Computers & Industrial Engineering 46 (2), 233-241, 2004
622004
MR/GI/1 queues by positively correlated arrival stream
R Szekli, RL Disney, S Hur
Journal of Applied Probability 31 (2), 497-514, 1994
581994
An analysis of the M/G/1 system with N and T policy
S Hur, J Kim, C Kang
Applied Mathematical Modelling 27 (8), 665-675, 2003
492003
Batch arrival queues with vacations and server setup
S Hur, S Ahn
Applied Mathematical Modelling 29 (12), 1164-1181, 2005
442005
Efficient genetic algorithm for feature selection for early time series classification
G Ahn, S Hur
Computers & Industrial Engineering 142, 106345, 2020
432020
An analysis of the research methodologies and techniques in the industrial engineering using text mining
GH Cho, SY Lim, S Hur
Journal of Korean institute of industrial engineers 40 (1), 52-59, 2014
362014
Optimal replenishment decision for retailers with variable demand for deteriorating products under a trade-credit policy
B Sarkar, BK Dey, M Sarkar, S Hur, B Mandal, V Dhaka
RAIRO-Operations Research 54 (6), 1685-1701, 2020
352020
An algorithm for repairable item inventory system with depot spares and general repair time distribution
JS Kim, TY Kim, S Hur
Applied mathematical modelling 31 (5), 795-804, 2007
322007
Performance computation methods for composition of tasks with multiple patterns in cloud manufacturing
G Ahn, YJ Park, S Hur
International Journal of Production Research 57 (2), 517-530, 2019
272019
Performance analysis of automatic storage/retrieval systems by stochastic modelling
S Hur, J Nam
International journal of production research 44 (8), 1613-1626, 2006
262006
Departure process of a single server queueing system with Markov renewal input and general service time distribution
SY Lim, S Hur, SJ Noh
Computers & Industrial Engineering 51 (3), 519-525, 2006
202006
Development of indicator of data sufficiency for feature-based early time series classification with applications of bearing fault diagnosis
G Ahn, H Lee, J Park, S Hur
Processes 8 (7), 790, 2020
172020
Bayesian network model to diagnose WMSDs with working characteristics
G Ahn, S Hur, MC Jung
International journal of occupational safety and ergonomics, 2018
172018
Probabilistic graphical framework for estimating collaboration levels in cloud manufacturing
G Ahn, YJ Park, S Hur
Sustainability 9 (2), 277, 2017
162017
A membership probability–based undersampling algorithm for imbalanced data
G Ahn, YJ Park, S Hur
Journal of Classification 38 (1), 2-15, 2021
152021
Multiobjective real-time scheduling of tasks in cloud manufacturing with genetic algorithm
G Ahn, S Hur
Mathematical Problems in Engineering 2021, 2021
152021
The system can't perform the operation now. Try again later.
Articles 1–20