A new iterative fuzzy clustering approach for incomplete data S Goel, M Tushir Journal of Statistics and Management Systems 23 (1), 91-102, 2020 | 11 | 2020 |
A New semi-supervised clustering for incomplete data S Goel, M Tushir Journal of Intelligent & Fuzzy Systems 42 (2), 727-739, 2022 | 7 | 2022 |
Optimization of production scheduling in two stage flow shop scheduling problem with m equipotential machines at first stage D Gupta, S Goel, N Mangla International Journal of System Assurance Engineering and Management 13 (3 …, 2022 | 6 | 2022 |
Different approaches for missing data handling in fuzzy clustering: a review S Goel, M Tushir Recent Advances in Electrical & Electronic Engineering (Formerly Recent …, 2020 | 5 | 2020 |
A semi-supervised clustering for incomplete data S Goel, M Tushir Applications of Artificial Intelligence Techniques in Engineering: SIGMA …, 2019 | 5 | 2019 |
Three Stage Flow Shop Scheduling Model with Equipotential Machines SG Deepak Gupta International Journal on Future Revolution in Computer Science …, 2018 | 5 | 2018 |
Linear interpolation-based fuzzy clustering approach for missing data handling S Goel, M Tushir International Conference on Advanced Communication and Computational …, 2019 | 4 | 2019 |
Bi-objective flow shop scheduling with equipotential parallel machines K Malhotra, D Gupta, S Goel, AK Tripathi Malaysian Journal of Mathematical Sciences 16 (3), 451-470, 2022 | 2 | 2022 |
Branch and bound technique for two stage flow shop scheduling model with equipotential machines at every stage D Gupta, S Goel International Journal of Operational Research 44 (4), 462-472, 2022 | 2 | 2022 |
A Comparative study of different approaches for clustering of incomplete medical data S Goel, M Tushir 2023 13th International Conference on Cloud Computing, Data Science …, 2023 | 1 | 2023 |
Nx2 flow shop scheduling problem with parallel machines at every stage, processing time associated with probabilities D Gupta, S Goel Adv Math Sci J 9 (3), 1061-1069, 2020 | 1 | 2020 |
Scheduling Involving Equipotential Processors with Constraint as Fuzzy Utilization Time of Jobs K Malhotra, D Gupta, S Goel, AK Tripathi International Conference on Data Analytics and Insights, 491-503, 2023 | | 2023 |
Comparison of Bb With Meta-heuristic Approach in Optimization of Three Stage Fss With Multiple Processors K Malhotra, D Gupta, S Goel, AK Tripathi | | 2023 |
Kernel Functions for Clustering of Incomplete Data: A Comparative Study S Goel, M Tushir Advances in Data Computing, Communication and Security: Proceedings of …, 2022 | | 2022 |
A new imputation-based incomplete data-driven fuzzy modeling for accuracy improvement in ubiquitous computing applications S Goel, M Tushir International Journal of Pervasive Computing and Communications 17 (4), 426-442, 2021 | | 2021 |
5. Optimization of Production Scheduling in Two Phase Flow Shop Scheduling Problem by Branch and Bound Technique under Fuzzy Environment SG Deepak Gupta International Journal of Advanced Science and Technology 29 (4), 6773-6781, 2020 | | 2020 |
Two Stage Flow Shop Scheduling Model Including Transportation Time with Equipotential Machines at Every Stage SG Deepak Gupta International Journal of Innovative Technology and Exploring Engineering …, 2019 | | 2019 |
THREE STAGE FLOW SHOP SCHEDULING MODEL WITH M-EQUIPOTENTIAL MACHINES SG Deepak Gupta 2018 IJRAR 6 (1), 217-222, 2018 | | 2018 |
Design and development of scheduling models S Goel Mullana-Ambala, 0 | | |