Lean Six-Sigma application in business process outsourced organization S Ray, B John International Journal of Lean Six Sigma 2 (4), 371-380, 2011 | 46 | 2011 |
Application of desirability function for optimizing the performance characteristics of carbonitrided bushes B John International Journal of Industrial Engineering Computations 4 (2013), 305 - 314, 2013 | 41 | 2013 |
Reduction of rework in bearing end plate using six sigma methodology: A case study B John, A Areshankar Journal of Applied Research on Industrial Engineering 5 (1), 10 - 26, 2018 | 20 | 2018 |
Application of Mahalanobis-Taguchi system and design of experiments to reduce the field failures of splined shafts B John International Journal of Quality & Reliability Management 31 (6), 681-697, 2014 | 16 | 2014 |
Improving the resolution time performance of an application support process using Six Sigma methodology B John, RS Kadadevaramath International journal of lean six sigma 11 (4), 663-686, 2020 | 14 | 2020 |
An application of integrated EPC–SPC methodology for simultaneously monitoring multiple output characteristics B John, S Singhal International Journal of Quality & Reliability Management 36 (5), 669-685, 2019 | 14 | 2019 |
A modified control chart for monitoring non-normal characteristics B John, SM Subhani International Journal of Productivity and Quality Management 29 (3), 309-328, 2020 | 13 | 2020 |
Designing software development processes to optimize multiple output performance characteristics B John, RS Kadadevaramath, IA Edinbarough Software Quality Professional 19 (4), 16 - 24, 2017 | 11 | 2017 |
Simultaneous optimization of multiple performance characteristics of carbonitrided pellets: a case study B John International Journal of Advanced Manufacturing Technology 61 (5-8), 585-594, 2012 | 11 | 2012 |
A fuzzy quantitative model for assessing the performance of pharmaceutical supply chain under uncertainty F Ahmad, B John Kybernetes 52 (3), 828-873, 2023 | 9 | 2023 |
A dual response surface optimization methodology for achieving uniform coating thickness in powder coating process B John International Journal of Indus trial Engineering Computations 6 (2015), 469 …, 2015 | 9 | 2015 |
A regression spline control chart for monitoring characteristics exhibiting nonlinear profile over time B John, V Agarwal The TQM Journal 31 (3), 507-522, 2019 | 8 | 2019 |
A methodology for quantitatively managing the bug fixing process using Mahalanobis Taguchi system B John, RS Kadadevarmath Management Science Letters 5 (12), 1081-1090, 2015 | 8 | 2015 |
A novel approach for the solution of multiobjective optimization problem using hesitant fuzzy aggregation operator F Ahmad, AY Adhami, B John, A Reza RAIRO Operations Research 56 (1), 275-292, 2022 | 6 | 2022 |
Application of multistage process control methodology for software quality management B John, RS Kadadevaramath, IA Edinbarough Journal of Project Management 1 (2), 55-66, 2016 | 6 | 2016 |
Quality and Reliability Engineering: Recent Trends and Future Directions B John, UH Acharya, AK Chakraborty, ( Editors) Allied Publishers, India, ISBN: 978-81-8424-831-9, 2013 | 6 | 2013 |
Improving the insurance claim processing process using Six Sigma methodology B John, P Parikh International journal of six sigma and competitive advantage 12 (4), 348-368, 2020 | 5 | 2020 |
Modeling the Defect Density of Embedded System Software Using Bayesian Belief Networks: A Case Study B John Software Quality Professional 14 (3), 39-45, 2012 | 5 | 2012 |
Optimization of actuator performance using robust engineering and feature selection methodologies: A case study B John International Journal of Productivity and Performance Management 60 (6), 642-652, 2011 | 5 | 2011 |
Optimization of software development life cycle process to minimize the delivered defect density B John, RS Kadadevaramath OPSEARCH 56 (4), 1199–1212, 2019 | 4 | 2019 |