Prashanth Pai
Prashanth Pai
P.A COLLEGE OF ENGINEERING MANGALORE
Verified email at pace.edu.in
TitleCited byYear
OEE-A tool to measure the effectiveness of TPM implementation in industries-A review
R CG, P Pai, TR Srinivas, MJ Raghavendra
32016
A Study on Usage of Total Productive Maintenance (TPM) in Selected SMEs
MP Pai, CG Ramachandra, TR Srinivas, MJ Raghavendra
IOP Conference Series: Materials Science and Engineering 376 (1), 012117, 2018
12018
Reliability Assessment and Study of Quality Control Tools on Intermixer and Dump Mill of a Tyre Manufacturing Industry
MP Pai, CG Ramachandra, TR Srinivas, MJ Raghavendra
MATEC Web of Conferences 144, 05001, 2018
12018
A survey on factors affecting total productive maintenance (TPM) in service industries
PP Manihalla, RC Gopal, ST Rao, RM Javaraiah
AIP Conference Proceedings 2080 (1), 060005, 2019
2019
Optimization of Surface Roughness in Turning Operation in Machining of TI-6AL-4V (Titanium Grade-5)
MJ Raghavendra, CG Ramachandra, TR Srinivas, MP Pai
IOP Conference Series: Materials Science and Engineering 376 (1), 012118, 2018
2018
Modeling & Analysis of a Multi-Nut Operating Tool Using Catia & Ansys
P Pai, AR MP, B Manjunath, S Shaikh, N Gaded
Journal of Mechanical Engineering and Automation 7 (5), 139-144, 2017
2017
Antifriction Bearing Diagnostics in a Manufacturing Industry – A Case Study
Syed Zeashan, Subhan Ali, Prashanth Pai M
Journal of Mechanical Engineering and Automation 6 (5A), 58-62, 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–7