Dr. Amit kumar
Dr. Amit kumar
Assistant Professor in Lovely Professional university jalandher india
Verified email at lpu.co.in
Title
Cited by
Cited by
Year
Performability analysis of a system under 1-out-of-2: G scheme with perfect reworking
M Ram, A Kumar
Journal of the Brazilian Society of Mechanical Sciences and Engineering 37 …, 2015
322015
Performability analysis of a system under 1-out-of-2: G scheme with perfect reworking
M Ram, A Kumar
Journal of the Brazilian Society of Mechanical Sciences and Engineering 37 …, 2015
322015
Reliability measures improvement and sensitivity analysis of a coal handling unit for thermal power plant
M Ram, A Kumar
International Journal of Engineering 26 (9), 1059-1066, 2013
282013
Performance of a structure consisting a 2-out-of-3: F substructure under human failure
M Ram, A Kumar
Arabian Journal for Science and Engineering 39 (11), 8383-8394, 2014
212014
Sensitivity analysis for casting process under stochastic modelling
A Kumar, A Varshney, M Ram
International Journal of Industrial Engineering Computations 6 (3), 419-432, 2015
152015
System reliability measures in the presence of common cause failures
A Kumar, M Ram
International Journal of Industrial and Systems Engineering 24 (1), 44-61, 2016
92016
Paper mill plant performance evaluation with power supply in standby mode
M Ram, A Kumar
International Journal of Quality & Reliability Management, 2015
72015
Industrial system performance under multistate failures with standby mode
A Kumar, M Ram, S Pant, A Kumar
Modeling and Simulation in Industrial Engineering, 85-100, 2018
52018
Performance of marine power plant given generator, main and distribution switchboard failures
A Kumar, M Ram
Journal of Marine Science and Application 14 (4), 450-458, 2015
42015
Effects of k-out-of-n: G/F and parallel redundancy in an industrial system through reliability approach
A Kumar, M Ram
AIP conference proceedings 1860 (1), 020046, 2017
32017
Optimization of casting process through reliability approach
A Kumar, M Ram, RS Rawat
International Journal of Quality & Reliability Management, 2017
32017
Turbofan engine performance under reliability measures approach
A Kumar, R Kumar, M Ram
International Journal of Engineering 30 (4), 610-619, 2017
32017
Reliability analysis of an industrial system under cost-free warranty and system rest policy
P Kumar, A Kumar
Journal of KONBiN 49 (2), 377-395, 2019
22019
Analysis of various reliability parameters for rice industry
P Kumar, A Kumar
Journal of Physics: Conference Series 1531 (1), 012065, 2020
2020
Performance evaluation of Water pump system through Markov Process and Reliability approach
A Kumar
Journal of the Gujarat Research Society 21 (8), 586-598, 2019
2019
Reliability and Sensitivity Assessment of a Sugar Mill through Mathematical Modeling
A Kumar, M Manglik
Mathematics Applied to Engineering and Management, 285, 2019
2019
Performance modeling and optimization for complex repairable system of paint manufacturing unit using a hybrid BFO-PSO algorithm
A Kumar, V Kumar, V Modgil
International Journal of Quality & Reliability Management, 2019
2019
Optimization of Call Drop system (CDS) through reliability approach
P Gaur, P Saini, A Kumar, M Ram
2016 International Conference on Emerging Trends in Communication …, 2016
2016
Erratum to: Performance of a Structure Consisting a 2-Out-of-3: F Substructure Under Human Failure
M Ram, A Kumar
Arabian Journal for Science and Engineering 40 (3), 993-993, 2015
2015
Reliability & sensitivity estimation of Suspension Bridge by using Mathematical Modeling and probabilistic approach
NV A. Kumar, M. Ram, M. Negi
Advances in Reliability Analysis and its Applications, 10.1007/978-3-030 …, 0
The system can't perform the operation now. Try again later.
Articles 1–20