Comparison of parametric and nonparametric models for traffic flow forecasting BL Smith, BM Williams, RK Oswald Transportation Research Part C: Emerging Technologies 10 (4), 303-321, 2002 | 1339 | 2002 |
Traffic flow forecasting: comparison of modeling approaches BL Smith, MJ Demetsky Journal of transportation engineering 123 (4), 261-266, 1997 | 865 | 1997 |
Short-Term Traffic Flow Prediction: Neural Network Approach MJD Brian L Smith Transportation Research Record: Journal of the Transportation Research Board …, 1994 | 645* | 1994 |
Traffic signal control with connected vehicles NJ Goodall, BL Smith, B Park Transportation Research Record 2381 (1), 65-72, 2013 | 403 | 2013 |
Divine war in the Old Testament and in the ancient Near East SM Kang Walter de Gruyter, 1989 | 306 | 1989 |
An investigation into the impact of rainfall on freeway traffic flow BL Smith, KG Byrne, RB Copperman, SM Hennessy, NJ Goodall 83rd annual meeting of the Transportation Research Board, Washington DC, 2004 | 227 | 2004 |
Exploring imputation techniques for missing data in transportation management systems BL Smith, WT Scherer, JH Conklin Transportation Research Record 1836 (1), 132-142, 2003 | 225 | 2003 |
New procedure for detector data screening in traffic management systems RE Turochy, BL Smith Transportation Research Record 1727 (1), 127-131, 2000 | 114 | 2000 |
Multiple-interval freeway traffic flow forecasting BL Smith, MJ Demetsky Transportation Research Record 1554 (1), 136-141, 1996 | 98 | 1996 |
Characterization of freeway capacity reduction resulting from traffic accidents BL Smith, L Qin, R Venkatanarayana Journal of Transportation Engineering 129 (4), 362-368, 2003 | 96 | 2003 |
Freeway accident likelihood prediction using a panel data analysis approach Y Qi, BL Smith, J Guo Journal of transportation engineering 133 (3), 149-156, 2007 | 76 | 2007 |
Freeway traffic flow rate measurement: Investigation into impact of measurement time interval JM Ulmer Journal of transportation engineering 129, 223, 2003 | 76 | 2003 |
Development and evaluation of enhanced intellidrive-enabled lane changing advisory algorithm to address freeway merge conflict H Park, CS Bhamidipati, BL Smith Transportation research record 2243 (1), 146-157, 2011 | 75 | 2011 |
Data collection time intervals for stochastic short-term traffic flow forecasting J Guo, BM Williams, BL Smith Transportation Research Record 2024 (1), 18-26, 2007 | 74 | 2007 |
A prototype case-based reasoning system for real-time freeway traffic routing AW Sadek, BL Smith, MJ Demetsky Transportation Research Part C: Emerging Technologies 9 (5), 353-380, 2001 | 73 | 2001 |
Microscopic estimation of freeway vehicle positions from the behavior of connected vehicles NJ Goodall, BL Smith, BB Park Journal of Intelligent Transportation Systems 20 (1), 45-54, 2016 | 70 | 2016 |
Investigating benefits of intellidrive in freeway operations: Lane changing advisory case study H Park, BL Smith Journal of Transportation Engineering 138 (9), 1113-1122, 2012 | 70 | 2012 |
Data–driven methodology for signal timing plan development: A computational approach BL Smith, WT Scherer, TA Hauser, BB Park Computer‐Aided Civil and Infrastructure Engineering 17 (6), 387-395, 2002 | 67 | 2002 |
Wireless location technology-based traffic monitoring: Critical assessment and evaluation of an early-generation system BL Smith, H Zhang, MD Fontaine, MW Green Journal of Transportation Engineering 130 (5), 576-584, 2004 | 66 | 2004 |
Forecasting freeway traffic flow for intelligent transportation systems application BL Smith University of Virginia, 1995 | 65 | 1995 |