An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem H Seidgar, M Kiani, M Abedi, H Fazlollahtabar International Journal of Production Research 52 (4), 1240-1256, 2014 | 80 | 2014 |
Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits M Abedi, H Seidgar, H Fazlollahtabar, R Bijani International Journal of Production Research 53 (6), 1680-1711, 2015 | 52 | 2015 |
Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem H Seidgar, M Zandieh, I Mahdavi Journal of Industrial and Production Engineering 33 (6), 404-425, 2016 | 41 | 2016 |
Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance H Seidgar, M Zandieh, H Fazlollahtabar, I Mahdavi Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2016 | 33 | 2016 |
A Multi Depot Simultaneous Pickup and Delivery Problem with Balanced Allocation of Routes to Drivers. M Koulaeian, H Seidgar, M Kiani, H Fazlollahtabar International Journal of Industrial Engineering 22 (2), 2015 | 25 | 2015 |
Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach S Tadayonirad, H Seidgar, H Fazlollahtabar, R Shafaei Assembly Automation 39 (5), 944-962, 2019 | 19 | 2019 |
An efficient meta-heuristic algorithm for scheduling a two-stage assembly flow shop problem with preventive maintenance activities and Reliability approach H Seidgar, M Zandieh, I Mahdavi International Journal of Industrial and System Engineering 26 (1), 16-41, 2017 | 19 | 2017 |
Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics M Abedi, H Seidgar, H Fazlollahtabar Journal of Modelling in Management 12 (3), 525-550, 2017 | 17 | 2017 |
A hybrid particle swarm optimisation for scheduling just-in-time single machine with preemption, machine idle time and unequal release times H Seidgar, M Abedi, S Tadayonirad, H Fazlollahtabar International Journal of Production Research 53 (6), 1912-1935, 2015 | 17 | 2015 |
Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach H Seidgar, H Fazlollahtabar, M Zandieh Soft Computing 24 (11), 8377-8401, 2020 | 14 | 2020 |
An efficient hybrid of genetic and simulated annealing algorithms for multi server vehicle routing problem with multi entry H Seidgar, M Abedi, ST Rad, J Rezaeian International Journal of Industrial and Systems Engineering 24 (3), 333-360, 2016 | 14 | 2016 |
Scheduling of assembly flow shop problem and machines with random breakdowns H Seidgar, SR Tadayoni, Sahar International Journal of Operation Research, 29 (2), 273-293., 2017 | 13 | 2017 |
A new mathematical model for scheduling flexible flow shop problem with learning and forgetting effects of workers H Seidgar, MAST Rad International Journal of Industrial and System Engineering 21 (4), 534 - 549, 2015 | 10 | 2015 |
A new Bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates M Abedi, H Seidgar International Journal of Services and Operation Management 23 (2), 135-152, 2016 | 9 | 2016 |
Scheduling of a flexible flow shop with multiprocessor task by a hybrid approach based on genetic and imperialist competitive algorithms J Rezaeian, H Seidgar, M Kiani Journal of Optimization in Industrial Engineering 6 (13), 1-11, 2013 | 8 | 2013 |
Genetic and artificial bee colony algorithms for scheduling of multi-skilled manpower in combined manpower-vehicle routing problem H Seidgar, M Kiani, H Fazlollahtabar Production & Manufacturing Research 4 (1), 133-151, 2016 | 7 | 2016 |
Learning and forgetting effects of flexible flow shop scheduling N Tyagi, H Seidgar, M Abedi, AB Chandramouli International journal of innovation and applied studies 7 (3), 857, 2014 | 7 | 2014 |
Bi objective optimization for Just in time scheduling :Application in the two-stage assembly flow shop problem ST Rad, H Seidgar, RSS Gholami Journal of Quality Engineering and Production optimization 1 (1), 21-32, 2015 | 5 | 2015 |
A regional multi-objective Tabu search algorithm for a green heterogeneous dial-a-ride problem M Abedi, R Chiong, R Athauda, H Seidgar, Z Michalewicz, A Sturt 2019 IEEE Congress on Evolutionary Computation (CEC), 2082-2089, 2019 | 4 | 2019 |
An Efficient Genetic Algorithm for Two-stage Hybrid Flow Shop Scheduling with Preemption and Sequence Dependent Setup Time H Seidgar, M Ezzati, M Kiani, R Tavakkoli-Moghaddam Journal of Mathematics and computer Science 6 (1), 251-259, 2013 | 4* | 2013 |