Follow
Hany Seidgar
Hany Seidgar
Department of Industrial Engineering ;Mazandaran University of Science and Technology
No verified email
Title
Cited by
Cited by
Year
An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
H Seidgar, M Kiani, M Abedi, H Fazlollahtabar
International Journal of Production Research 52 (4), 1240-1256, 2014
802014
Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits
M Abedi, H Seidgar, H Fazlollahtabar, R Bijani
International Journal of Production Research 53 (6), 1680-1711, 2015
522015
Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem
H Seidgar, M Zandieh, I Mahdavi
Journal of Industrial and Production Engineering 33 (6), 404-425, 2016
412016
Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance
H Seidgar, M Zandieh, H Fazlollahtabar, I Mahdavi
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2016
332016
A Multi Depot Simultaneous Pickup and Delivery Problem with Balanced Allocation of Routes to Drivers.
M Koulaeian, H Seidgar, M Kiani, H Fazlollahtabar
International Journal of Industrial Engineering 22 (2), 2015
252015
Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach
S Tadayonirad, H Seidgar, H Fazlollahtabar, R Shafaei
Assembly Automation 39 (5), 944-962, 2019
192019
An efficient meta-heuristic algorithm for scheduling a two-stage assembly flow shop problem with preventive maintenance activities and Reliability approach
H Seidgar, M Zandieh, I Mahdavi
International Journal of Industrial and System Engineering 26 (1), 16-41, 2017
192017
Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics
M Abedi, H Seidgar, H Fazlollahtabar
Journal of Modelling in Management 12 (3), 525-550, 2017
172017
A hybrid particle swarm optimisation for scheduling just-in-time single machine with preemption, machine idle time and unequal release times
H Seidgar, M Abedi, S Tadayonirad, H Fazlollahtabar
International Journal of Production Research 53 (6), 1912-1935, 2015
172015
Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach
H Seidgar, H Fazlollahtabar, M Zandieh
Soft Computing 24 (11), 8377-8401, 2020
142020
An efficient hybrid of genetic and simulated annealing algorithms for multi server vehicle routing problem with multi entry
H Seidgar, M Abedi, ST Rad, J Rezaeian
International Journal of Industrial and Systems Engineering 24 (3), 333-360, 2016
142016
Scheduling of assembly flow shop problem and machines with random breakdowns
H Seidgar, SR Tadayoni, Sahar
International Journal of Operation Research, 29 (2), 273-293., 2017
132017
A new mathematical model for scheduling flexible flow shop problem with learning and forgetting effects of workers
H Seidgar, MAST Rad
International Journal of Industrial and System Engineering 21 (4), 534 - 549, 2015
102015
A new Bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates
M Abedi, H Seidgar
International Journal of Services and Operation Management 23 (2), 135-152, 2016
92016
Scheduling of a flexible flow shop with multiprocessor task by a hybrid approach based on genetic and imperialist competitive algorithms
J Rezaeian, H Seidgar, M Kiani
Journal of Optimization in Industrial Engineering 6 (13), 1-11, 2013
82013
Genetic and artificial bee colony algorithms for scheduling of multi-skilled manpower in combined manpower-vehicle routing problem
H Seidgar, M Kiani, H Fazlollahtabar
Production & Manufacturing Research 4 (1), 133-151, 2016
72016
Learning and forgetting effects of flexible flow shop scheduling
N Tyagi, H Seidgar, M Abedi, AB Chandramouli
International journal of innovation and applied studies 7 (3), 857, 2014
72014
Bi objective optimization for Just in time scheduling :Application in the two-stage assembly flow shop problem
ST Rad, H Seidgar, RSS Gholami
Journal of Quality Engineering and Production optimization 1 (1), 21-32, 2015
52015
A regional multi-objective Tabu search algorithm for a green heterogeneous dial-a-ride problem
M Abedi, R Chiong, R Athauda, H Seidgar, Z Michalewicz, A Sturt
2019 IEEE Congress on Evolutionary Computation (CEC), 2082-2089, 2019
42019
An Efficient Genetic Algorithm for Two-stage Hybrid Flow Shop Scheduling with Preemption and Sequence Dependent Setup Time
H Seidgar, M Ezzati, M Kiani, R Tavakkoli-Moghaddam
Journal of Mathematics and computer Science 6 (1), 251-259, 2013
4*2013
The system can't perform the operation now. Try again later.
Articles 1–20