Follow
Makarand Kulkarni
Title
Cited by
Cited by
Year
A methodology for joint optimization for maintenance planning, process quality and production scheduling
D Pandey, MS Kulkarni, P Vrat
Computers & Industrial Engineering 61 (4), 1098-1106, 2011
1292011
Combined Taguchi and dual response method for optimization of a centerless grinding operation
MN Dhavlikar, MS Kulkarni, V Mariappan
Journal of Materials Processing Technology 132 (1-3), 90-94, 2003
1262003
Weibull accelerated failure time regression model for remaining useful life prediction of bearing working under multiple operating conditions
P Kundu, AK Darpe, MS Kulkarni
Mechanical Systems and Signal Processing 134, 106302, 2019
1022019
Joint consideration of production scheduling, maintenance and quality policies: a review and conceptual framework
D Pandey, MS Kulkarni, P Vrat
International Journal of Advanced Operations Management 2 (1-2), 1-24, 2010
862010
A framework for value co-creation through customization and personalization in the context of machine tool PSS
PU Zine, MS Kulkarni, R Chawla, AK Ray
Procedia CIRP 16, 32-37, 2014
732014
Managing quality in continuous casting process using product quality model and simulated annealing
MS Kulkarni, AS Babu
Journal of Materials Processing Technology 166 (2), 294-306, 2005
652005
Bearing diagnosis based on Mahalanobis–Taguchi–Gram–Schmidt method
P Shakya, MS Kulkarni, AK Darpe
Journal of Sound and Vibration 337, 342-362, 2015
642015
Optimisation of opportunistic maintenance of a multi-component system considering the effect of failures on quality and production schedule: A case study
PP Tambe, S Mohite, MS Kulkarni
The International Journal of Advanced Manufacturing Technology 69, 1743-1756, 2013
632013
A novel methodology for online detection of bearing health status for naturally progressing defect
P Shakya, MS Kulkarni, AK Darpe
Journal of Sound and Vibration 333 (21), 5614-5629, 2014
622014
Vibration-based fault diagnosis in rolling element bearings: ranking of various time, frequency and time-frequency domain data-based damage identi cation parameters
P Shakya, AK Darpe, MS Kulkarni
International journal of condition monitoring 3 (2), 53-62, 2013
602013
A correlation coefficient based vibration indicator for detecting natural pitting progression in spur gears
P Kundu, AK Darpe, MS Kulkarni
Mechanical Systems and Signal Processing 129, 741-763, 2019
592019
Optimal maintenance schedule decisions for machine tools considering the user's cost structure
BK Lad, MS Kulkarni
International Journal of Production Research 50 (20), 5859-5871, 2012
522012
A simulation based optimization approach for spare parts forecasting and selective maintenance
P Sharma, MS Kulkarni, V Yadav
Reliability Engineering & System Safety 168, 274-289, 2017
512017
Accelerated wear testing for evaluating the life characteristics of copper–graphite tribological composite
K Rajkumar, K Kundu, S Aravindan, MS Kulkarni
Materials & Design 32 (5), 3029-3035, 2011
512011
A parameter estimation method for machine tool reliability analysis using expert judgement
BK Lad, MS Kulkarni
International journal of data analysis techniques and strategies 2 (2), 155-169, 2010
492010
A review on diagnostic and prognostic approaches for gears
P Kundu, AK Darpe, MS Kulkarni
Structural Health Monitoring 20 (5), 2853-2893, 2021
482021
An ensemble decision tree methodology for remaining useful life prediction of spur gears under natural pitting progression
P Kundu, AK Darpe, MS Kulkarni
Structural Health Monitoring 19 (3), 854-872, 2020
472020
Integrated reliability and optimal maintenance schedule design: a life cycle cost based approach
BK Lad, MS Kulkarni
International Journal of Product Lifecycle Management 3 (1), 78-90, 2008
412008
Integrated design of preventive maintenance and quality control policy parameters with CUSUM chart
D Shrivastava, MS Kulkarni, P Vrat
The International Journal of Advanced Manufacturing Technology 82, 2101-2112, 2016
402016
A superimposition based approach for maintenance and quality plan optimization with production schedule, availability, repair time and detection time constraints for a single …
PP Tambe, MS Kulkarni
Journal of Manufacturing Systems 37, 17-32, 2015
402015
The system can't perform the operation now. Try again later.
Articles 1–20