Follow
Mario Tucci
Title
Cited by
Cited by
Year
Optimal resource leveling using non-serial dyanamic programming
M Bandelloni, M Tucci, R Rinaldi
European Journal of Operational Research 78 (2), 162-177, 1994
1861994
Layout design for a low capacity manufacturing line: a case study
F De Carlo, MA Arleo, O Borgia, M Tucci
International Journal of Engineering Business Management 5, 35, 2013
592013
Using simulation for supply chain analysis: reviewing and proposing distributed simulation frameworks
R Bandinelli, M Rapaccini, M Tucci, F Visintin
Production Planning & Control 17 (2), 167-175, 2006
402006
Effectiveness of maintenance approaches for High Reliability Organizations
S Andriulo, MA Arleo, F de Carlo, MG Gnoni, M Tucci
IFAC-PapersOnLine 48 (3), 466-471, 2015
302015
Bucket brigades to increase productivity in a luxury assembly line
F De Carlo, O Borgia, M Tucci
International Journal of Engineering Business Management 5, 28, 2013
292013
Bayesian regression based condition monitoring approach for effective reliability prediction of random processes in autonomous energy supply operation
A BahooToroody, F De Carlo, N Paltrinieri, M Tucci, P Van Gelder
Reliability Engineering & System Safety 201, 106966, 2020
272020
OEE evaluation of a paced assembly line through different calculation and simulation methods: a case study in the pharmaceutical environment
F De Carlo, MA Arleo, M Tucci
International Journal of Engineering Business Management 6 (Godište 2014), 6-27, 2014
272014
Accelerated degradation tests for reliability estimation of a new product: a case study for washing machines
F De Carlo, O Borgia, M Tucci
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2014
252014
Risk-based inspections enhanced with Bayesian networks
F De Carlo, O Borgia, M Tucci
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2011
242011
Accelerated life tests as an integrated methodology for product design, qualification and production control: a case study in household appliances
M Tucci, F De Carlo, O Borgia, N Fanciullacci
Production & Manufacturing Research 2 (1), 112-127, 2014
192014
From theory to application: tabu search in textile production scheduling
M Tucci, R Rinaldi
Production Planning & Control 10 (4), 365-374, 1999
181999
Towards forklift safety in a warehouse: An approach based on the automatic analysis of resource flows
A Cantini, F De Carlo, M Tucci
Sustainability 12 (21), 8949, 2020
162020
Accelerated life tests for new product qualification: a case study in the household appliance
O Borgia, F De Carlo, N Fanciullacci, M Tucci
IFAC Proceedings Volumes 46 (7), 269-274, 2013
152013
The use of dynamic object oriented Bayesian networks in reliability assessment: a case study
O Borgia, F De Carlo, M Peccianti, M Tucci
Recent advances in maintenance and infrastructure management. London …, 2009
122009
Methods and Tools for the Rliability Engineering: a plant maintenance perspective
M Tucci, G Bettini
ITA, 2006
122006
Conception of a prototype to validate a maintenance expert system
F De Carlo, M Tucci, O Borgia
International Journal of engineering and Technology 5 (5), 4273-4282, 2013
112013
Different approaches in making simulation languages compliant with HLA specification
M Tucci, R Revetria
USA, 2001
112001
Imperfect maintenance modelling by dynamic object oriented Bayesian networks
F De Carlo, O Borgia, M Tucci
Int J Eng Technol 5 (5), 4282-4295, 2013
92013
Experiences in distributed simulation for benchmarking production scheduling systems
R Bandinelli, S Cavalieri, S Terzi, M Tucci
International IMS Forum 2004. Global Challenges in Manufacturing, 1017-1026, 2004
92004
The role of digital twins in the fulfilment logistics chain
C Piancastelli, M Tucci
IFAC-PapersOnLine 53 (2), 10574-10578, 2020
82020
The system can't perform the operation now. Try again later.
Articles 1–20