Design iteration in construction projects–Review and directions P Mujumdar, JU Maheswari Alexandria Engineering Journal 57 (1), 321-329, 2018 | 46 | 2018 |
Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects JU Maheswari, VPC Charlesraj, A Goyal, P Mujumdar Procedia Engineering 123, 308-315, 2015 | 10 | 2015 |
Structured methodology for applying multiple domain matrices (MDM) to construction projects P Mujumdar, P Muraleedharan, JU Maheswari Proceedings of the 16th International DSM Conference, 299-308, 2014 | 10 | 2014 |
A design iteration framework for construction projects P Mujumdar, JU Maheswari Proc. of the RICS Cobra, New Delhi, 2013 | 9 | 2013 |
A study on DSM partitioning through case study approach P Mujumdar, S Bhattacharya, J Uma Maheswari ICoRD’15–Research into Design Across Boundaries Volume 2: Creativity …, 2015 | 5 | 2015 |
Alternate beeline diagramming method network analysis for interdependent design entities P Mujumdar, JU Maheswari Engineering, Construction and Architectural Management 26 (1), 66-84, 2019 | 3 | 2019 |
A framework on causes and effects of design iterations P Mujumdar, V Matsagar Journal of The Institution of Engineers (India): Series A 98, 171-176, 2017 | 3 | 2017 |
BDM–MDM integrated solution concept for scheduling information-driven projects JU Maheswari, P Mujumdar, SPS Padala, A Gwaskoti Engineering, Construction and Architectural Management 29 (2), 1016-1037, 2022 | 2 | 2022 |
Integrated Framework for Automating the Structural Design Iteration P Mujumdara, JU Maheswarib ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2015 | 1 | 2015 |
Design optimization of steel members using openstaad and genetic algorithm P Mujumdar, V Matsagar Advances in Structural Engineering: Mechanics, Volume One, 233-244, 2015 | 1 | 2015 |
A cloud-based solution for information and communication design iterations P Mujumdar, JU Maheswari, A Kumar 4th World Congress on Information and Communication Technologies, December, 8-10, 0 | 1 | |
Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects P Mujumdar | | 2017 |
Part VII: Managing Multiple Domains in Complex Projects: Structured Methodology for Applying Multiple Domain Matrices (MDM) to Construction Projects P Mujumdar, P Muraleedharan, JU Maheswari Risk and change management in complex systems, 297-308, 2014 | | 2014 |
Resource-constrained project scheduling using Relationship Diagramming Method (RDM) JU Maheswari, P Mujumdar, AGVPC Charlesraj | | |