Follow
Abdur Rahim
Title
Cited by
Cited by
Year
The integration of Six Sigma and lean management
S Salah, A Rahim, JA Carretero
International journal of lean Six Sigma 1 (3), 249-274, 2010
5422010
Economic design of x–bar control charts under weibull shock models
PK Banerjee, MA Rahim
Technometrics 30 (4), 407-414, 1988
3071988
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
M Ben-Daya
International Journal of Production Economics 76 (3), 257-264, 2002
2412002
Effect of maintenance on the economic design of x-control chart
M Ben-Daya, MA Rahim
European Journal of Operational Research 120 (1), 131-143, 2000
2032000
Integrated Models in Production Planning and Scheduling, Maintenance and Quality: A Review
LA Hadidi, M Umar, A Rahim
International Journal of Industrial and Systems Engineering 10 (1), 21-50, 2012
1832012
Integrated production maintenance and quality model for imperfect processes
M Ben-Daya
IIE transactions 31 (6), 491-501, 1999
1771999
Joint determination of production quantity, inspection schedule, and control chart design
MA Rahim
IIE transactions 26 (6), 2-11, 1994
1691994
Joint and R Charts with Variable Sample Sizes and Sampling Intervals
AFB Costa
Journal of Quality Technology 31 (4), 387-397, 1999
1591999
A generalized model for the economic design of x̄control charts for production systems with increasing failure rate and early replacement
MA Rahim, PK Banerjee
Naval Research Logistics (NRL) 40 (6), 787-809, 1993
1581993
Common barriers to implementation and development of TQM
MJ Whalen, MA Rahim
INDUSTRIAL MANAGEMENT-CHICAGO THEN ATLANTA- 36, 19-19, 1994
1511994
Total quality management in hospitals
PJ Short, MA Rahim
Total quality management 6 (3), 255-264, 1995
1231995
Economic design of X-bar charts with variable parameters: the Markov chain approach
AFB Costa, MA Rahim
Journal of Applied Statistics 28 (7), 875-885, 2001
1212001
Joint X and R charts with variable parameters
AFB Costa
IIE transactions 30 (6), 505-514, 1998
1201998
A generalized economic model for joint determination of production run, inspection schedule and control chart design
MA Rahim, M Ben-Daya
International Journal of Production Research 36 (1), 277-289, 1998
911998
Monitoring process mean and variability with one non-central chi-square chart
AFB Costa, MA Rahim
Journal of Applied Statistics 31 (10), 1171-1183, 2004
902004
Integrated model for determining the optimal initial settings of the process mean and the optimal production run assuming quadratic loss functions
MA Rahim, F Tuffaha
International Journal of Production Research 42 (16), 3281-3300, 2004
902004
Economic statistical design of X-bar control charts for system with gamma (Lambda, 2) in control lines
HA Al-Oraini, MA Rahim
Computer and Industrial Engineering 43 (3), 645-654, 2002
822002
Determination of Optimal Design Parameters of Joint X-bar and R Charts
MA Rahim
Journal of Quality Technology 21 (1), 65-70, 1989
781989
Optimal production run for a process with random linear drift
MA Rahim, PK Banerjee
Omega 16 (4), 347-351, 1988
761988
A CCC‐r chart for high‐yield processes
H Ohta, E Kusukawa, A Rahim
Quality and Reliability Engineering International 17 (6), 439-446, 2001
752001
The system can't perform the operation now. Try again later.
Articles 1–20