Follow
AJAI JAIN
Title
Cited by
Cited by
Year
A review on manufacturing flexibility
A Jain, PK Jain, FTS Chan, S Singh
International Journal of Production Research 51 (19), 5946-5970, 2013
2312013
Integration of Process Planning and Scheduling: A State of Art Review
RK Phanden, A Jain, R Verma
International Journal of Computer Integrated Manufacturing 24 (6), 517-534, 2011
1452011
An integrated scheme for process planning and scheduling in FMS
A Jain, PK Jain, IP Singh
The International Journal of Advanced Manufacturing Technology 30 (11), 1111 …, 2006
922006
An Approach for Integration of Process Planning and Scheduling
RK Phanden, A Jain, R Verma
International Journal of Computer Integrated Manufacturing 26 (4), 284-302, 2013
912013
Optimization of multiple-machining characteristics in wire electrical discharge machining of punching die using grey relational analysis
K Jangra, A Jain, S Grover
Journal of Scientific and Industrial Research 69, 606-612, 2010
772010
Performance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach
P Sharma, A Jain
CIRP Journal of Manufacturing Science and Technology 10, 110-119, 2015
652015
A review on job shop scheduling with setup times
P Sharma, A Jain
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2016
642016
Multi- objective optimization of process parameters in Wire Electric Discharge Machining of Ti-6-2- 4-2 alloy
MP Garg, A Jain, G Bhushan
The Arabian Journal for Science and Engineering, 2013
632013
Modelling and multi-objective optimization of process parameters of wire electrical discharge machining using non-dominated sorting genetic algorithm-II
MP Garg, A Jain, G Bhushan
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2012
612012
Energy efficiency improvement strategies for industrial boilers: a case study
RD Gupta, S Ghai, A Jain
Journal of engineering and technology 1 (1), 52-56, 2011
542011
Experimental Investigation of Spark Gap and Material Removal Rate of Al/ZrO2(P) –MMC Machined with Wire EDM
SK Garg, A Manna, A Jain
Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2016
392016
An Investigation on Machinability of Al/10% ZrO2(P)- Metal Matrix Composite by WEDM and Parametric Optimization using Desirability Function Approach
SK Garg, A Manna, A Jain
The Arabian Journal for Science and Engineering, 2014
382014
A genetic algorithm‐based approach for job shop scheduling
RK Phanden, A Jain, R Verma
Journal of Manufacturing Technology Management 23 (7), 937-946, 2012
372012
Effect of routing flexibility and sequencing rules on performance of stochastic flexible job shop manufacturing system with setup times: Simulation approach
P Sharma, A Jain
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2017
342017
Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times
P Sharma, A Jain
Frontiers of Mechanical Engineering 9, 380-389, 2014
262014
New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times
P Sharma, A Jain
Concurrent Engineering 24 (1), 58-68, 2016
202016
Assessment of makespan performance for flexible process plans in job shop scheduling
RK Phanden, A Jain
IFAC-PapersOnLine 48 (3), 1948-1953, 2015
192015
A Genetic Algorithm-based Approach for Flexible Job Shop Scheduling
RK Phanden, A Jain, R , Verma
Applied Mechanics and Materials 110 (116), 3930-3937, 2012
192012
An Experimental Investigation for Optimization of WEDM Parameters During Machining of Fabricated Al/ZrO2(p)-MMC
SK Garg, A Manna, A Jain
Arabian Journal for Science and Engineering 38, 3471-3483, 2013
182013
An investigation on the performance of dispatching rules in FMS scheduling
A Jain, PK Jain, IP Singh
International journal of simulation modelling 3 (2-3), 49-60, 2004
172004
The system can't perform the operation now. Try again later.
Articles 1–20