Izabela Nielsen
Izabela Nielsen
Professor, PhD, MSc, Eng., Aalborg University
Verified email at m-tech.aau.dk
Title
Cited by
Cited by
Year
Green supplier selection using fuzzy group decision making methods: A case study from the agri-food industry
N Banaeian, H Mobli, B Fahimnia, IE Nielsen, M Omid
Computers & Operations Research 89, 337-347, 2018
3402018
Green supplier selection criteria: from a literature review to a flexible framework for determination of suitable criteria
IE Nielsen, N Banaeian, P Golińska, H Mobli, M Omid
Logistics operations, supply chain management and sustainability, 79-99, 2014
732014
Criteria definition and approaches in green supplier selection–a case study for raw material and packaging of food industry
N Banaeian, H Mobli, IE Nielsen, M Omid
Production & Manufacturing Research 3 (1), 149-168, 2015
662015
Scheduling a single mobile robot for part-feeding tasks of production lines
QV Dang, I Nielsen, K Steger-Jensen, O Madsen
Journal of Intelligent Manufacturing 25 (6), 1271-1287, 2014
652014
A methodology for implementation of mobile robot in adaptive manufacturing environments
I Nielsen, QV Dang, G Bocewicz, Z Banaszak
Journal of Intelligent Manufacturing 28 (5), 1171-1188, 2017
592017
A system of UAV application in indoor environment
Y Khosiawan, I Nielsen
Production & Manufacturing Research 4 (1), 2-22, 2016
502016
Optimal retailer investments in green operations and preservation technology for deteriorating items
S Saha, I Nielsen, I Moon
Journal of Cleaner Production 140, 1514-1527, 2017
482017
Comparative analysis of government incentives and game structures on single and two-period green supply chain
IE Nielsen, S Majumder, SS Sana, S Saha
Journal of cleaner production 235, 1371-1398, 2019
472019
A simulation-based genetic algorithm approach for reducing emissions from import container pick-up operation at container terminal
NAD Do, IE Nielsen, G Chen, P Nielsen
Annals of Operations Research 242 (2), 285-301, 2016
422016
Automated guided vehicles fleet match-up scheduling with production flow constraints
G Bocewicz, I Nielsen, Z Banaszak
Engineering Applications of Artificial Intelligence 30, 49-62, 2014
422014
Task scheduling system for UAV operations in indoor environment
Y Khosiawan, Y Park, I Moon, JM Nilakantan, I Nielsen
Neural Computing and Applications 31 (9), 5431-5459, 2019
412019
A hybrid multi-agent approach to the solving supply chain problems
P Sitek, IE Nielsen, J Wikarek
Procedia Computer Science 35, 1557-1566, 2014
352014
National Accounts and Economic Value: A Study in Concepts
U Reich
Springer, 2001
332001
Is it a strategic move to subsidized consumers instead of the manufacturer?
S Saha, S Majumder, IE Nielsen
IEEE access 7, 169807-169824, 2019
322019
Production flows scheduling subject to fuzzy processing time constraints
G Bocewicz, IE Nielsen, ZA Banaszak
International Journal of Computer Integrated Manufacturing 29 (10), 1105-1127, 2016
322016
Differential evolution algorithm for solving RALB problem using cost-and time-based models
JM Nilakantan, I Nielsen, SG Ponnambalam, S Venkataramanaiah
The international journal of advanced manufacturing technology 89 (1-4), 311-332, 2017
302017
Advanced planning and scheduling technology
K Steger-Jensen, HH Hvolby, P Nielsen, I Nielsen
Production Planning & Control 22 (8), 800-808, 2011
302011
Analyzing and evaluating product demand interdependencies
P Nielsen, I Nielsen, K Steger-Jensen
Computers in Industry 61 (9), 869-876, 2010
302010
Optimizing supply chain waste management through the use of RFID technology
I Nielsen, M Lim, P Nielsen
2010 IEEE International Conference on RFID-Technology and Applications, 296-301, 2010
302010
Iterative multimodal processes scheduling
G Bocewicz, I Nielsen, Z Banaszak
Annual Reviews in Control 38 (1), 113-122, 2014
292014
The system can't perform the operation now. Try again later.
Articles 1–20