Yihai Bao
Title
Cited by
Cited by
Year
Macromodel-based simulation of progressive collapse: RC frame structures
Y Bao, SK Kunnath, S El-Tawil, HS Lew
Journal of Structural Engineering 134 (7), 1079-1091, 2008
2362008
Testing and analysis of steel and concrete beam-column assemblies under a column removal scenario
F Sadek, JA Main, HS Lew, Y Bao
Journal of Structural Engineering 137 (9), 881-892, 2011
2062011
An experimental and computational study of reinforced concrete assemblies under a column removal scenario
HS Lew, Y Bao, F Sadek, JA Main, S Pujol, MA Sozen
NIST Technical Note 1720, 2011
782011
Modeling of Reinforced Concrete Assemblies under Column-Removal Scenario
Y Bao, HS Lew, SK Kunnath
Journal of Structural Engineering 140 (1), 2014
762014
Simplified progressive collapse simulation of RC frame–wall structures
Y Bao, SK Kunnath
Engineering Structures 32 (10), 3153-3162, 2010
652010
Experimental study of reinforced concrete assemblies under column removal scenario
HS Lew, Y Bao, S Pujol, MA Sozen
ACI Structural Journal 111 (4), 881, 2014
642014
Collapse Test of Three-Story Half-Scale Reinforced Concrete Frame Building
Y Xiao, S Kunnath, FW Li, YB Zhao, HS Lew, Y Bao
ACI Structural Journal 112 (4), 429-438, 2015
562015
Experimental study of through diaphragm connection types under a column removal scenario
X Qin, W Wang, Y Chen, Y Bao
Journal of Constructional Steel Research 112, 293–304, 2015
222015
Advances in computational simulation of gravity-induced disproportionate collapse of RC frame buildings
SK Kunnath, Y Bao, S El-Tawil
Journal of Structural Engineering 144 (2), 03117003, 2018
212018
Slab effect of composite subassemblies under a column removal scenario
W Wang, J Wang, X Sun, Y Bao
Journal of Constructional Steel Research 129, 141-155, 2017
212017
A special reinforcing technique to improve resistance of beam-to-tubular column connections for progressive collapse prevention
X Qin, W Wang, Y Chen, Y Bao
Engineering Structures 117, 26-39, 2016
212016
Robustness of Precast Concrete Frames: Experimental and Computational Studies
JA Main, Y Bao, HS Lew, F Sadek
202014
Evaluation of structural robustness against column loss: Methodology and application to RC frame buildings
Y Bao, JA Main, SY Noh
Journal of Structural Engineering 143 (8), 04017066, 2017
182017
Simplified nonlinear simulation of shield tunnel lining reinforced by epoxy bonded steel plates
H Zhao, X Liu, Y Bao, Y Yuan, Y Bai
Tunnelling and Underground Space Technology 51, 362-371, 2016
162016
An experimental and computational study of precast concrete moment frames under a column removal scenario
JA Main, Y Bao, HS Lew, F Sadek, VP Chiarito, SD Robert, JO Torres
NIST Technical Note 1886, 2015
112015
Performance of precast concrete moment frames subjected to column removal: Part 1, experimental study
HS Lew, JA Main, Y Bao, F Sadek, VP Chiarito, SD Robert, JO Torres
PCI J 62 (5), 35-52, 2017
102017
Macromodel-based progressive collapse simulation of reinforced concrete structures
Y Bao
University of California, Davis, 2008
102008
Nonlinear simulation of tunnel linings with a simplified numerical modelling
H Zhao, X Liu, Y Bao, Y Yuan
Structural Engineering & Mechanics 61 (5), 593-603, 2017
92017
Robustness Assessment of RC Frame Buildings under Column Loss Scenarios
Y Bao, JA Main, HS Lew, F Sadek
82014
Full-scale test of a steel moment-resisting frame with composite floor under a penultimate edge column removal scenario
J Wang, W Wang, Y Bao, D Lehman
Journal of Constructional Steel Research 162, 105717, 2019
72019
The system can't perform the operation now. Try again later.
Articles 1–20