Macromodel-based simulation of progressive collapse: RC frame structures Y Bao, SK Kunnath, S El-Tawil, HS Lew Journal of Structural Engineering 134 (7), 1079-1091, 2008 | 306 | 2008 |
Testing and analysis of steel and concrete beam-column assemblies under a column removal scenario F Sadek, J Main, HS Lew, Y Bao Journal of Structural Engineering 137 (9), 2011 | 290 | 2011 |
Collapse Test of Three-Story Half-Scale Reinforced Concrete Frame Building Y Xiao, S Kunnath, FW Li, YB Zhao, HS Lew, Y Bao ACI Structural Journal 112 (4), 429-438, 2015 | 137 | 2015 |
An experimental and computational study of reinforced concrete assemblies under a column removal scenario HS Lew, Y Bao, F Sadek, JA Main, S Pujol, MA Sozen NIST Technical Note 1720, 2011 | 133 | 2011 |
Modeling of Reinforced Concrete Assemblies under Column-Removal Scenario Y Bao, HS Lew, SK Kunnath Journal of Structural Engineering 140 (1), 2014 | 119 | 2014 |
Experimental study of reinforced concrete assemblies under column removal scenario HS Lew, Y Bao, S Pujol, MA Sozen ACI Structural Journal 111 (4), 881, 2014 | 117 | 2014 |
Simplified progressive collapse simulation of RC frame–wall structures Y Bao, SK Kunnath Engineering Structures 32 (10), 3153-3162, 2010 | 91 | 2010 |
Simplified nonlinear simulation of shield tunnel lining reinforced by epoxy bonded steel plates H Zhao, X Liu, Y Bao, Y Yuan, Y Bai Tunnelling and Underground Space Technology 51, 362-371, 2016 | 64 | 2016 |
A special reinforcing technique to improve resistance of beam-to-tubular column connections for progressive collapse prevention X Qin, W Wang, Y Chen, Y Bao Engineering Structures 117, 26-39, 2016 | 61 | 2016 |
Advances in computational simulation of gravity-induced disproportionate collapse of RC frame buildings SK Kunnath, Y Bao, S El-Tawil Journal of Structural Engineering 144 (2), 03117003, 2018 | 59 | 2018 |
Evaluation of structural robustness against column loss: Methodology and application to RC frame buildings Y Bao, JA Main, SY Noh Journal of Structural Engineering 143 (8), 04017066, 2017 | 51 | 2017 |
Slab effect of composite subassemblies under a column removal scenario W Wang, J Wang, X Sun, Y Bao Journal of constructional steel research 129, 141-155, 2017 | 51 | 2017 |
Experimental study of through diaphragm connection types under a column removal scenario X Qin, W Wang, Y Chen, Y Bao Journal of Constructional Steel Research 112, 293–304, 2015 | 50 | 2015 |
Full-scale experimental investigation on stagger effect of segmental tunnel linings X Liu, Y Zhang, Y Bao Tunnelling and Underground Space Technology 102, 103423, 2020 | 40 | 2020 |
Full-scale test of a steel moment-resisting frame with composite floor under a penultimate edge column removal scenario J Wang, W Wang, Y Bao, D Lehman Journal of Constructional Steel Research 162, 105717, 2019 | 32 | 2019 |
Performance of precast concrete moment frames subjected to column removal: Part 1, experimental study HS Lew, JA Main, Y Bao, F Sadek, VP Chiarito, SD Robert, JO Torres PCI J 62 (5), 35-52, 2017 | 29 | 2017 |
Numerical modeling and parametric study of hybrid fiber-rebar reinforced concrete tunnel linings X Liu, Q Sun, W Song, Y Bao Engineering Structures 251, 113565, 2021 | 26 | 2021 |
Robustness of Precast Concrete Frames: Experimental and Computational Studies JA Main, Y Bao, HS Lew, F Sadek | 26 | 2014 |
Full-Scale Test of a Steel–Concrete Composite Floor System with Moment-Resisting Connections under a Middle-Edge Column Removal Scenario J Wang, W Wang, Y Bao Journal of Structural Engineering 146 (5), 04020067, 2020 | 21 | 2020 |
Investigation of the structural effect induced by stagger joints in segmental tunnel linings: Numerical explanation via macro-level structural modeling X Liu, Y Zhang, Y Bao, W Song Tunnelling and Underground Space Technology 120, 104284, 2022 | 20 | 2022 |