Determining the timing of project control points using a facility location model and simulation N Sabeghi, HR Tareghian, E Demeulemeester, H Taheri Computers & Operations Research 61, 69-80, 2015 | 29 | 2015 |
Using the generalized maximum covering location model to control a project’s progress N Sabeghi, HR Tareghian Computational Management Science 17 (1), 1-21, 2020 | 1 | 2020 |
Optimizing natural gas liquids (NGL) production process: A multi-objective approach for energy-efficient operations using genetic algorithm and artificial neural networks N Sabeghi, B Kiani Talaei, R Ghanbari, K Ghorbani-Moghadam Iranian Journal of Numerical Analysis and Optimization, 2024 | | 2024 |
Optimized distance measures on hesitant fuzzy numbers: An application A Keikha, N Sabeghi Journal of intelligent and fuzzy systems, 1-13, 2023 | | 2023 |
Maximum Covering Location Model in Project Control Problem N Sabeghi, HR TAREGHIAN | | 2013 |
On the comparison of FLM and SA for determining the optimal timings of control points in a project N Sabeghi, HR Tareghian, E Demeulemeester EURO-INFORMS European Conference on Operational Research, Date: 2013/07/01 …, 2013 | | 2013 |