Follow
Prof. Gulshan Chauhan
Prof. Gulshan Chauhan
Pro Vice Chancellor, Geeta University
Verified email at geetauniversity.edu.in
Title
Cited by
Cited by
Year
Measuring parameters of lean manufacturing realization
G Chauhan, TP Singh
Measuring Business Excellence 16 (3), 57-71, 2012
2072012
Production of AMC by stir casting–an overview
P Sharma, G Chauhan, N Sharma
International Journal of Contemporary Practices 2 (1), 23-46, 2011
942011
Resource flexibility for lean manufacturing: SAP-LAP analysis of a case study
G Chauhan, TP Singh
International Journal of Lean Six Sigma 4 (4), 370-388, 2013
412013
A phase-wise approach to implement lean manufacturing
G Chauhan, V Chauhan
International Journal of Lean Six Sigma 10 (1), 106-122, 2019
372019
An analysis of the status of resource flexibility and lean manufacturing in a textile machinery manufacturing company
G Chauhan
International Journal of Organizational Analysis 24 (1), 107-122, 2016
342016
Development and validation of resource flexibility measures for manufacturing industry
G Chauhan, TP Singh
Journal of Industrial Engineering and Management 7 (1), 21-41, 2014
342014
Lean manufacturing through management of labor and machine flexibility: A comprehensive review
G Chauhan, TP Singh
Global Journal of Flexible Systems Management 12, 59-80, 2011
262011
Significant parameters of labour flexibility contributing to lean manufacturing
TP Singh, G Chauhan
Global Journal of Flexible Systems Management 14, 93-105, 2013
172013
Cost reduction through lean manufacturing: a case study
G Chauhan, T P Singh, S K Sharma
International Journal of Industrial Engineering Practice 1 (1), 1-8, 2009
132009
Measuring the Status of Lean Manufacturing using AHP
G Chauhan, TP Singh, SK Sharma
International Journal on Emerging Technologies 1 (2), 115-120, 2010
12*2010
Role of machine flexibility in lean manufacturing
G Chauhan, T P Singh, S K Sharma
International Journal of Applied Engineering Research 4 (1), 25-33, 2009
102009
Change processes towards flexible lean manufacturing: a framework
G Chauhan, TP Singh, SK Sharma
International Journal of Performability Engineering 6 (4), 363-372, 2010
62010
Advance industrial approach for waste reduction: Lean Manufacturing
V Chahal, S Sharma, G Chauhan
International Journal of Emerging Technology and Advanced Engineering 3 (11 …, 2013
52013
PRODUCTION OF AMC BY STIR CASTING-AN OVERVIEW
NS Gulshan Chauhan PradeepSharma
International Journal of Contemporary Practises 2, 2008
5*2008
Data-driven prioritization of performance variables for flexible manufacturing systems: revealing key metrics with the best–worst method
A Bagherian, G Chauhan, AL Srivastav
The International Journal of Advanced Manufacturing Technology 130 (5), 3081 …, 2024
12024
Significant parameters of machine flexibility contributing to lean manufacturing
G Chauhan
International Journal of Emerging Research in Management and Technology 6 …, 2017
1*2017
Correction to: Data‑driven prioritization of performance variables for flexible manufacturing systems: revealing key metrics with the best–worst method
A Bagherian, G Chauhan, AL Srivastav
The International Journal of Advanced Manufacturing Technology, 1-1, 2024
2024
Evaluating the Ranking of Performance Variables in Flexible Manufacturing System through the Best-Worst Method
A Bagherian, G Chauhan, AL Srivastav, R Kumar Sharma
Designs 8 (1), 12, 2024
2024
Steam conservation study of sugar industry
G Chauhan, V Mohd
International Journal of Mechanical and Production Engineering Research and …, 2019
2019
Optimization of railway container yard
V Mohd, G Chauhan, S Mishra
International Journal of Mechanical and Production Engineering Research and …, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–20