Multi criteria FMECA for coal-fired thermal power plants using COPRAS-G D Das Adhikary, G Kumar Bose, D Bose, S Mitra International Journal of Quality & Reliability Management 31 (5), 601-614, 2014 | 88 | 2014 |
RAM investigation of coal-fired thermal power plants: a case study D Bose, S Chattopadhyay, G Bose, D Adhikary, S Mitra International Journal of Industrial Engineering Computations 3 (3), 423-434, 2012 | 73 | 2012 |
Availability and cost-centered preventive maintenance scheduling of continuous operating series systems using multi-objective genetic algorithm: A case study D Das Adhikary, GK Bose, DK Jana, D Bose, S Mitra Quality Engineering 28 (3), 352-357, 2016 | 52 | 2016 |
Reliability, Maintainability & Availability analysis of a coal fired power plant in eastern region of India DD Adhikary, GK Bose, S Mitra, D Bose Proceedings of the 2nd International Conference on Production and Industrial …, 2010 | 17 | 2010 |
Maintenance class-based cost-effective preventive maintenance scheduling of coal-fired power plants DD Adhikary, GK Bose, D Bose, S Mitra International Journal of Reliability and Safety 7 (4), 358-371, 2013 | 12 | 2013 |
Semiparametric reliability model in the failure analysis of a coal-fired boiler used in a thermal power plant—a case study DD Adhikary, GK Bose, D Bose, S Mitra Quality Engineering 27 (3), 353-360, 2015 | 6 | 2015 |
Integrated-Optimization of Production, Preventive Maintenance and Spare Parts Inventory of Continuous Operating Series Systems DD Adhikary, DK Jana Recent Advances in Intelligent Information Systems and Applied Mathematics …, 2020 | | 2020 |
Availability centered maintenance planning for a coal fired boiler in a thermal power plant D Das Adhikary Kolkata, 0 | | |