Jeng Feng Chin
Title
Cited by
Cited by
Year
Approach to prediction of laser cutting quality by employing fuzzy expert system
CZ Syn, M Mokhtar, JF Chin, YHP Manurung
Expert Systems with applications 38 (6), 7558-7568, 2011
722011
Modified CONWIP systems: a review and classification
J Prakash, JF Chin
Production Planning & Control 26 (4), 296-307, 2015
462015
Feature selection in multimedia: The state-of-the-art review
PY Lee, WP Loh, JF Chin
Image and vision computing 67, 29-42, 2017
192017
Transfer of total productive maintenance practice to supply chain
MY Chong, JF Chin, HS Hamzah
Total Quality Management & Business Excellence 23 (3-4), 467-488, 2012
192012
Reducing electronic component losses in lean electronics assembly with Six Sigma approach
TP Yi, JF Chin, J Prakash, LW Ping
International Journal of Lean Six Sigma 3 (3), 206-230, 2012
182012
ISO 9001: 2008 Implementation In a SME: A Case Study.
HA Samat, S Kamaruddin, JF Chin
Pertanika Journal of Social Sciences & Humanities 20 (2), 2012
18*2012
PARALLEL KANBAN-CONWIP SYSTEM FOR BATCH PRODUCTION IN ELECTRONICS ASSEMBLY.
MY Chong, J Prakash, SL Ng, R Ramli, JF Chin
International Journal of Industrial Engineering 20, 2013
172013
LEAN INCIPIENCE SPIRAL MODEL FOR SMALL AND MEDIUM ENTERPRISES.
MY Chong, JF Chin, WP Loh
International Journal of Industrial Engineering 20, 2013
162013
A comparison of push and pull production controls under machine breakdown
J Prakash, JF Chin
Int. Journal of Business Science and Applied Management 6 (3), 2011
162011
Fundamental simulation studies of CONWIP in front-end wafer fabrication
NA Muhammad, JF Chin, S Kamarrudin, MA Chik, J Prakash
Journal of Industrial and Production Engineering 32 (4), 232-246, 2015
152015
Milk-run kanban system for raw printed circuit board withdrawal to surface-mounted equipment
SL Chee, MY Chong, JF Chin
Journal of Industrial Engineering and Management (JIEM) 5 (2), 382-405, 2012
142012
Implementation of hybrid parallel kanban-CONWIP system: A case study
J Prakash, JF Chin
Cogent Engineering 1 (1), 2014
102014
Self-reinforcing mechanisms for cellularisation: a longitudinal case study
MN Che Ani, JF Chin
International Journal of Production Research 54 (3), 696-711, 2016
82016
Comparison between production controls in multi-stage multi-product manufacturing environments: two case studies
J Prakash, JF Chin
Production & Manufacturing Research 2 (1), 477-500, 2014
62014
Parallel CONWIP for a High-mix Multi-stage Production System with the Entrance of Rework
J Prakash, MY Chong, S Azreen, JF Chin
Journal of Production Research & Management 1 (2), 2011
62011
Simulation Analysis of Rabbit Chase Models on a Cellular Manufacturing System
BC Ani, M Norzaimi, AB Ismail, SA Mustafa, JF Chin
Applied Mechanics and Materials 315, 78-82, 2013
52013
Effects of inventory classifications on CONWIP system: A case study
J Prakash, JF Chin
Journal of Management Analytics 4 (3), 296-320, 2017
42017
Parallel kanban-CONWIP for production system with rework entrance
MY Chong, SA Mustafa, J Prakash, JF Chin
International Journal of Manufacturing Research 8 (4), 357-377, 2013
42013
Theoretical Approach with Simulation Models on Full Cross Training and Workforce Working Schedule to Increase IT Help Desk Efficiency
P Thannimalai, MM Kadhum, JF Chin
Procedia-Social and Behavioral Sciences 129, 236-243, 2014
32014
A constraint programming-based genetic algorithm (CPGA) for capacity output optimization
KEN Goh, JF Chin, WP Loh, MCL Tan
Journal of Industrial Engineering and Management 7 (5), 1222-1249, 2014
22014
The system can't perform the operation now. Try again later.
Articles 1–20