Follow
Viswanath Kumar Ganesan
Title
Cited by
Cited by
Year
Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain
KP Li, VK Ganesan, AI Sivakumar*
International journal of production research 43 (13), 2671-2685, 2005
902005
Scheduling rules for dynamic shops that manufacture multi-level jobs
KM Mohanasundaram, K Natarajan, G Viswanathkumar, ...
Computers & Industrial Engineering 44 (1), 119-131, 2003
902003
Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
K Li, VK Ganesan, AI Sivakumar
Computers & Industrial Engineering 51 (2), 264-278, 2006
672006
A branch and bound algorithm to minimize completion time variance on a single processor
G Viswanathkumar, G Srinivasan
Computers & Operations Research 30 (8), 1135-1150, 2003
542003
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
K Li, AI Sivakumar, VK Ganesan
European Journal of Operational Research 187 (2), 442-455, 2008
512008
Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
K Li, AI Sivakumar, VK Ganesan
International Journal of Production Economics 115 (2), 482-491, 2008
412008
Hierarchical minimization of completion time variance and makespan in jobshops
VK Ganesan, AI Sivakumar, G Srinivasan
Computers & Operations Research 33 (5), 1345-1367, 2006
302006
Solution methodology for synchronizing assembly manufacturing and air transportation of consumer electronics supply chain
K Li, AI Sivakumar, M Mathirajan, VK Ganesan
Available at SSRN 588024, 2004
232004
Methodologies for synchronised scheduling of assembly and air transportation in a consumer electronics supply chain
K Li, VK Ganesan, AI Sivakumar, M Mathirajan
International Journal of Logistics Systems and Management 2 (1), 52-67, 2006
182006
Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times
VK Ganesan, AI Sivakumar
International journal of production economics 103 (2), 633-647, 2006
172006
System and Method for Budget-Compliant, Fair and Efficient Manpower Management
S SenGupta, S Salsingikar, S Bose, V Ganesan
US Patent App. 13/395,982, 2013
102013
Order acceptance and scheduling: overview and complexity results
VP Palakiti, U Mohan, VK Ganesan
International Journal of Operational Research 34 (3), 369-386, 2019
92019
Order acceptance and scheduling in a parallel machine environment with weighted completion time
VP Palakiti, U Mohan, VK Ganesan
European journal of industrial engineering 12 (4), 535-557, 2018
82018
Enhancing operational efficiency of a container operator: A simulation optimization approach
S Sinha, VK Ganesan
Proceedings of the 2011 Winter Simulation Conference (WSC), 1722-1733, 2011
72011
Look ahead batching to minimize earliness/tardiness measures in batch processes
AK Gupta, SA Iyer, VK Ganesan
IEEE Conference on Robotics, Automation and Mechatronics, 2004. 2, 1101-1106, 2004
72004
Hot lot management: Minimizing cycle time in batch processes
AK Gupta, VK Ganesan, AI Sivakumar
2004 IEEE International Engineering Management Conference (IEEE Cat. No …, 2004
72004
Solving Large Scale Vehicle Routing Problems with Hard Time Windows under Travel Time Uncertainty
K Haripriya, VK Ganesan
IFAC-PapersOnLine 55 (10), 233-238, 2022
42022
Adaptive inventory replenishment for dynamic supply chains with uncertain market demand
VK Ganesan, D Sundararaj, AP Srinivas
Industry 4.0 and Advanced Manufacturing: Proceedings of I-4AM 2019, 325-335, 2021
42021
Markov process modeling of a system under WIPLOAD control
C Qi, S Appa Iyer, VK Ganesan
42005
Bi-objective schedule control of batch processes in semiconductor manufacturing
VK Ganesan, AK Gupta, SA Iyer
IEEE Conference on Robotics, Automation and Mechatronics, 2004. 2, 1077-1082, 2004
42004
The system can't perform the operation now. Try again later.
Articles 1–20