Follow
Subhajit Das
Subhajit Das
Assistant Professor, Department of Mathematics, Bhagalpur College of Engineering
Verified email at scholar.buruniv.ac.in
Title
Cited by
Cited by
Year
Advance and delay in payments with the price-discount inventory model for deteriorating items under capacity constraint and partially backlogged shortages
A Duary, S Das, MG Arif, KM Abualnaja, MAA Khan, M Zakarya, ...
Alexandria Engineering Journal 61 (2), 1735-1745, 2022
542022
A production inventory model with partial trade credit policy and reliability
S Das, MAA Khan, EE Mahmoud, AH Abdel-Aty, KM Abualnaja, ...
Alexandria Engineering Journal 60 (1), 1325-1338, 2021
472021
An application of control theory for imperfect production problem with carbon emission investment policy in interval environment
S Das, R Mondal, AA Shaikh, AK Bhunia
Journal of the Franklin Institute 359 (5), 1925-1970, 2022
242022
Product replacement policy in a production inventory model with replacement period-, stock-, and price-dependent demand
S Das, AK Manna, EE Mahmoud, KM Abualnaja, AH Abdel-Aty, ...
Journal of Mathematics 2020, 1-8, 2020
182020
Carbon emission controlled investment and warranty policy based production inventory model via meta-heuristic algorithms
AK Manna, S Das, AA Shaikh, AK Bhunia, I Moon
Computers & Industrial Engineering 177, 109001, 2023
132023
Investigate an imperfect green production system considering rework policy via Teaching-Learning-Based Optimizer algorithm
H Ali, S Das, AA Shaikh
Expert Systems with Applications 214, 119143, 2023
112023
Effects of emission reduction and rework policy in a production system of green products: An interval valued optimal control theoretic approach
S Das, G Mandal, AK Manna, AA Shaikh, AK Bhunia
Computers & Industrial Engineering 179, 109212, 2023
102023
Pricing strategies and advance payment-based inventory model with partially backlogged shortages under interval uncertainty
R Mondal, S Das, SC Das, AA Shaikh, AK Bhunia
International Journal of Systems Science: Operations & Logistics 10 (1), 2070296, 2023
72023
Analysis of a production system of green products considering single-level trade credit financing via a parametric approach of intervals and meta-heuristic algorithms
S Das, AK Manna, AA Shaikh, I Konstantaras
Applied Intelligence 53 (16), 19532-19562, 2023
72023
Theoretical developments and application of variational principle in a production inventory problem with interval uncertainty
S Das, MS Rahman, AA Shaikh, AK Bhunia, A Ahmadian
International Journal of Systems Science: Operations & Logistics 10 (1), 2052377, 2023
52023
A mathematical model of the production inventory problem for mixing liquid considering preservation Facility
MS Rahman, S Das, AK Manna, AA Shaikh, AK Bhunia, ...
Mathematics 9 (24), 3166, 2021
42021
Impact of emission and service constraint for an imperfect production system under two level Hamiltonian
S Das, H Ali, AA Shaikh, AK Bhunia
Optimal Control Applications and Methods 44 (5), 2796-2820, 2023
32023
Pricing and dynamic service policy for an imperfect production system: extended Pontryagin’s maximum principle for interval control problems
S Das, G Mandal, F Akhtar, AA Shaikh, AK Bhunia
Expert Systems with Applications 238, 122090, 2024
22024
Impact of COVID 19 on the demand for an inventory model under preservation technology and advance payment facility
AA Shaikh, S Das, GC Panda, IM Hezam, AF Alrasheedi, J Gwak
Open Physics 20 (1), 836-849, 2022
22022
Interval Laplace transform and its application in production inventory
S Das, MS Rahman, AA Shaikh, AK Bhunia, I Konstantaras
Mathematical Methods in the Applied Sciences 46 (4), 3983-4002, 2023
12023
On the Parametric Representation of Type-2 Interval and Ranking: Its Application in the Unconstrained Non-linear Programming Problem Under Type-2 Interval Uncertainty
S Das, MS Rahman, SK Mahato, AA Shaikh, AK Bhunia
Computational Modelling in Industry 4.0: A Sustainable Resource Management …, 2022
12022
A new approach based on inventory control using interval differential equation with application to manufacturing system.
MS Rahman, S Das, AK Manna, AA Shaikh, AK Bhunia, A Ahmadian, ...
Discrete & Continuous Dynamical Systems-Series S 15 (2), 2022
12022
Warranty, free service and rework policy for an imperfect manufacturing system with SAR sensitive demand under emission taxation
S Das, AA Shaikh, AK Bhunia, I Konstantaras
Computers & Industrial Engineering 187, 109765, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–18