Follow
Mehdi Abedi
Title
Cited by
Cited by
Year
A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines
M Abedi, R Chiong, N Noman, R Zhang
Expert Systems with Applications 157, 113348, 2020
872020
An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
H Seidgar, M Kiani, M Abedi, H Fazlollahtabar
International Journal of Production Research 52 (4), 1240-1256, 2014
802014
Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits
M Abedi, H Seidgar, H Fazlollahtabar, R Bijani
International Journal of Production Research 53 (6), 1680-1711, 2015
522015
Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm
L He, W Li, R Chiong, M Abedi, Y Cao, Y Zhang
Applied Soft Computing 111, 107654, 2021
352021
A modified genetic algorithm for non-emergency outpatient appointment scheduling with highly demanded medical services considering patient priorities
R Alizadeh, J Rezaeian, M Abedi, R Chiong
Computers & Industrial Engineering 139, 106106, 2020
222020
Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics
M Abedi, H Seidgar, H Fazlollahtabar
Journal of Modelling in Management 12 (3), 525-550, 2017
172017
A hybrid particle swarm optimisation for scheduling just-in-time single machine with preemption, machine idle time and unequal release times
H Seidgar, M Abedi, S Tadayonirad, H Fazlollahtabar
International Journal of Production Research 53 (6), 1912-1935, 2015
172015
A hybrid particle swarm optimisation approach for energy-efficient single machine scheduling with cumulative deterioration and multiple maintenances
M Abedi, R Chiong, N Noman, R Zhang
2017 IEEE Symposium Series on Computational Intelligence (SSCI), 1-8, 2017
152017
An efficient hybrid of genetic and simulated annealing algorithms for multi server vehicle routing problem with multi entry
H Seidgar, M Abedi, ST Rad, J Rezaeian
International Journal of Industrial and Systems Engineering 24 (3), 333-360, 2016
142016
JIT-scheduling in unrelated parallel-machine environment with aging effect and multi-maintenance activities
Y Zarook, M Abedi
International Journal of Services and Operations Management 18 (1), 99-113, 2014
112014
A new mathematical model for scheduling flexible flow shop problem with learning and forgetting effects of workers
H Seidgar, M Abedi, ST Rad
International Journal of Industrial and Systems Engineering 21 (4), 534-549, 2015
102015
A new bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates
M Abedi, H Seidgar
International Journal of Services and Operations Management 23 (2), 135-152, 2016
92016
Learning and forgetting effects of flexible flow shop scheduling
N Tyagi, H Seidgar, M Abedi, AB Chandramouli
International journal of innovation and applied studies 7 (3), 857, 2014
72014
A preemptive scheduling and due date assignment for single-machine in batch delivery system
N Tyagi, M Abedi, RG Varshney
Conference on Advances in Communication and Control Systems (CAC2S 2013), 60-64, 2013
52013
A regional multi-objective Tabu search algorithm for a green heterogeneous dial-a-ride problem
M Abedi, R Chiong, R Athauda, H Seidgar, Z Michalewicz, A Sturt
2019 IEEE Congress on Evolutionary Computation (CEC), 2082-2089, 2019
42019
Single machine scheduling in a batch delivery system with fixed delivery dates
N Tyagi, M Abedi, RG Varshney
International Journal of Engineering and Technology 5 (4), 3484-3488, 2013
42013
Genetic algorithm for minimization of total cost including customer’s waiting cost and machine setup cost for sequence dependent jobs on a single processor
N Tyagi, M Abedi, RG Varshney, Y Zarook, AB Chandramouli
Journal of Engineering Technology 2, 97-109, 2014
22014
A Metaheuristic Framework for Energy-Intensive Industries With Batch Processing Machines
M Abedi, R Chiong, N Noman, X Liao, D Li
IEEE Transactions on Engineering Management, 2022
12022
A Two-phase Heuristic Method for Agri-fresh Inventory Optimisation
M Abedi, P Paam, R Berretta
2020 IEEE Symposium Series on Computational Intelligence (SSCI), 2608-2615, 2020
2020
Quality Control and Productivity Management
M Abedi, F Kangi
AHA, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–20