Follow
Tarek Al-Hawari
Title
Cited by
Cited by
Year
A sequential TPM-based scheme for improving production effectiveness presented with a case study
O Bataineh, T Al-Hawari, H Alshraideh, D Dalalah
Journal of Quality in Maintenance Engineering 25 (1), 144-161, 2019
1282019
Optimization of vehicle routing with inventory allocation problems in Cold Supply Chain Logistics
N Al Theeb, HJ Smadi, TH Al-Hawari, MH Aljarrah
Computers & Industrial Engineering 142, 106341, 2020
722020
Application of the Analytic Network Process to facility layout selection
T Al-Hawari, A Mumani, A Momani
Journal of manufacturing systems 33 (4), 488-497, 2014
532014
A fuzzy logic application for selecting layered manufacturing techniques
S Khrais, T Al-Hawari, O Al-Araidah
Expert Systems with Applications 38 (8), 10286-10291, 2011
472011
Development of a genetic algorithm for multi-objective assembly line balancing using multiple assignment approach
T Al-Hawari, M Ali, O Al-Araidah, A Mumani
The International Journal of Advanced Manufacturing Technology 77, 1419-1432, 2015
342015
Quality assurance and accreditation of engineering education in Jordan
F Aqlan, O Al-Araidah, T Al-Hawari
European Journal of Engineering Education 35 (3), 311-323, 2010
262010
Selection of temperature measuring sensors using the analytic hierarchy process
T Al-Hawari, SM AL-B'ool, A Momani
242011
Classifying and ranking healthcare quality attributes using integrated Kano-fuzzy analytical hierarchy process model
A Momani, T Al-Hawari, H Al-Shebami, O Al-Araidah
Engineering Management Research 3 (1), 68-88, 2014
212014
Performance analysis of an automated production system with queue length dependent service rates
T Al-Hawari, F Aqlan, O Al-Araidah
International Journal of Simulation Modelling 9 (4), 184-194, 2010
202010
Simulation-based analysis and productivity improvement of a fully automatic bottle-filling production system: a practical case study
T Al-Hawari, F Aqlan, Z Al-Faqeer
2010 Second International Conference on Computer Modeling and Simulation 4 …, 2010
202010
Impact of assignment, inventory policies and demand patterns on supply chain performance
T Al-Hawari, A Ahmed, S Khrais, A Mumani
International Journal of Simulation Modelling 12 (3), 164-177, 2013
162013
A software application for E-Kanban-based WIP control in the aluminium industry
T Al-Hawari, F Aqlan
International Journal of Modelling in Operations Management 2 (2), 119-137, 2012
152012
Extending the WEDBA to the fuzzy multi-criteria decision-making environment
T Al-Hawari, A Naji, H Alshraideh, O Bataineh
International Journal of Computer Applications in Technology 59 (4), 330-346, 2019
112019
Development and evaluation of a Basestock-CONWIP pull production control strategy in balanced assembly systems
T Al-Hawari, AG Qasem, H Smadi
Simulation Modelling Practice and Theory 84, 83-105, 2018
102018
A software application for the selection of temperature measuring sensors using the analytic hierarchy process
T Al–Hawari, S Al–Bo'ol, AM Momani
International journal of computer applications in technology 44 (3), 198-209, 2012
62012
2D laser scanner selection using fuzzy logic
T Al-Hawari, S Khrais, O Al-Araidah, AF Al-Dwairi
Expert Systems with Applications 38 (5), 5614-5619, 2011
62011
A simulation-based framework for evaluation of healthcare systems with interacting factors and correlated performance measures
T Al-Hawari, A Khanfar, A Mumani, O Bataineh
Arabian Journal for Science and Engineering, 1-18, 2022
52022
The effects of pre or post delay variable changes in discrete event simulation and combined DES/system dynamics approaches in modelling supply chain performance
T Al-Hawari, A Gailan Qasem, H Smadi, H Arauydah, N Al Theeb
Journal of Simulation 16 (2), 147-165, 2022
42022
A Gaussian process approach for monitoring autocorrelated batch production processes
H Alshraideh, M Rababah, T Al‐Hawari, O Bataineh
Quality and Reliability Engineering International 38 (1), 18-29, 2022
32022
Using expanded real options analysis to evaluate capacity expansion decisions under uncertainty in the construction material industry
AM Momani, TH Al-Hawari, RW Mousa
South African Journal of Industrial Engineering 27 (2), 1-14, 2016
32016
The system can't perform the operation now. Try again later.
Articles 1–20