Follow
halim rusjdi
halim rusjdi
sekolah tinggi teknik pln
No verified email
Title
Cited by
Cited by
Year
PENANGGULANGAN KOROSI PADA PIPA GAS DENGAN METODE CATODIC PROTECTION (ANODA KORBAN) PT PGN SOLUTION AREA TANGERANG: Utami Wahyuningsih, Halim Rusjdi, Eko Sulistiyo
RT Jurnal
Jurnal Powerplant 5 (1), 40-50, 2017
72017
Pengenalan Keselamatan Dan Kesehatan Kerja Di PT Cita Rasa Palembang
U Wahyuningsih, E Sulistyo, H Rusjdi, W Alfalah, S Sudirmanto, ...
TERANG 3 (2), 155-162, 2021
62021
Perancangan PLTMH Kapasitas 30 kW, Desa Giritirta, Kec. Pejawaran, Banjarnegara, Jawa Tengah
V Antono, CFAR Yusreza
JURNAL POWERPLANT 4 (2), 107-113, 2016
6*2016
Analisis Perpindahan Kalor High Pressure Heater PLTU Banten 3 Lontar Unit 1
H Rusjdi, E Prabowo, W Rian
Jurnal Power Plant 4 (3), 122-210, 2016
52016
ANALISA PERBANDINGAN UNJUK KERJA PEMAKAIAN BAHAN BAKAR MOTOR KONVENSIONAL DENGAN MOTOR LISTRIK ULC PLN AREA CENGKARENG: Tasdik Darmana, Oktaria Handayani, Halim Rusjdi
RT Jurnal
ENERGI & KELISTRIKAN 10 (1), 64-69, 2018
12018
Analisa perbandingan unjuk kerja pemakaian bahan bakar motor konvensional dengan motor listrik ULC PLN area cengkareng
T Darmana, O Handayani, H Rusjdi
Jurnal Energi & Kelistrikan 10 (1), 0
1
Studi Kasus Boiler CFB: Kenaikan Temperatur Bed
HR Abuhanif, N Firdaus, H Rusjdi
KILAT 11 (2), 158-166, 2022
2022
Aplikasi Solar Rooftop System Sebagai On Load Power Supply Pada Pompa Reservoir Air Di Pondok Pesantren Madarijul Mubtadi’in
H Rusjdi, E Sulistiyo, DP Sari, N Kurniasih, RP Putra, M Ridwan, ...
PROSIDING-SNEKTI 3, 2022
2022
Pengaruh Misalignment Boiler Feed Pump dan Penanganannya Pada Unit 4 Di PLTU Asam–Asam Kalimantan Selatan
MS Ramadhoni, H Rusjdi
INSTITUT TEKNOLOGI PLN, 2021
2021
Perhitungan Biaya Perbaikan Pompa Injeksi Kapasitas 1460 kW Pada Unit 1 Di PLTD WAENA JAYAPURA
M RAWAI, H Rusjdi
INSTITUT TEKNOLOGI PLN, 2021
2021
Chiller Performance Analysis Of Multiple Faults
RA Munandar, N Firdaus, H Rusjdi
Kilat 9 (2), 154-162, 2020
2020
PERHITUNGAN LMTD (LOG MEAN TEMPERATURE DIFFERENCE) KONDENSOR PLTGU PRIOK BLOK 1 PADA POLA OPERASI 2-2-1 DENGAN DAYA 110 MW DAN 3-3-1 DAYA 167 MW
H Abdullah, H Rusjdi
Institut Teknologi PLN, 2020
2020
PENGARUH OVERHAUL TERHADAP PENURUNAN VIBRASI PADA SCREEN BACK WASH PUMP DI PT. INDONESIA POWER PLTGU CILEGON OMU
Y YUDISTIRA, H Rusjdi
Institut Teknologi PLN, 2020
2020
ANALISIS PERFORMA LUBE OIL COOLER TURBIN GAS SEBELUM DAN SESUDAH PERAWATAN DI BLOK 1B PLTGU PRIOK
F ISHAQ, H Rusjdi
Institut Teknologi PLN, 2020
2020
PENGARUH KEBOCORAN SLAG SLURRY PUMP PADA ASH CONTAINING WATER TREATMENT DI PLTU PT. LESTARI BANTEN ENERGI
PTM Sitompul, H Rusjdi
Institut Teknologi PLN, 2020
2020
Pengaruh Overhaul Terhadap Efektifitas Kondensor Di PT. Indonesia Power Up Suralaya Unit III
H Rusjdi, A Ghozali, N Nofirman
JURNAL POWERPLANT 8 (1), 59-70, 2020
2020
PENGARUH SISTEM PROTEKSI KATODIK (SACRIFICIAL ANODE) TERHADAP KETAHANAN KOROSI PADA PIPA GAS MILIK PT PGN AREA BITUNG
A KURNIADI, H Rusjdi
Sekolah Tinggi Teknik PLN, 2019
2019
PENGAPLIKASIAN MANAGEMENT OUTAGE PADA PENGUKURAN CLEARANCE TURBIN DI PLTU UNIT 3 PT PJB UP GRESIK
SH TRIAYUNI, H Rusjdi
Sekolah Tinggi Teknik PLN, 2019
2019
UJI VIBRASI SEBAGAI INDIKASI TERJADINYA MISALIGNMENT PADA WATER COOLING PUMP 2.3 PLTGU TAMBAK LOROK PT. INDONESIA POWER UP SEMARANG
MA Fadhillah, H Rusjdi
Sekolah Tinggi Teknik PLN, 2019
2019
PERBANDINGAN EFISIENSI TURBIN GAS PADA UNIT 1.1 SEBELUM DAN SESUDAH COMBUSTION INSPECTION DI PLTGU TAMBAK LOROK PT. INDONESIA POWER UP SEMARANG
PAP WIBOWO, H Rusjdi
Sekolah Tinggi Teknik PLN, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–20