Fuzzy critical chain method for project scheduling under resource constraints and uncertainty
LD Long, A Ohsato
International journal of project management 26 (6), 688-698, 2008
2992008
A genetic algorithm-based method for scheduling repetitive construction projects
LD Long, A Ohsato
Automation in construction 18 (4), 499-511, 2009
1572009
Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution
DL Luong, DH Tran, PT Nguyen
International Journal of Construction Management 21 (3), 271-283, 2021
1222021
Nature-inspired metaheuristic ensemble model for forecasting energy consumption in residential buildings
DH Tran, DL Luong, JS Chou
Energy 191, 116552, 2020
882020
Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects
DH Tran, L Luong-Duc, MT Duong, TN Le, AD Pham
Journal of Computational Design and Engineering 5 (2), 160-172, 2018
612018
Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution
DH Tran, LD Long
Engineering, Construction and Architectural Management 25 (5), 623-638, 2018
512018
Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem
LD Long, DH Tran, PT Nguyen
International Journal of Computer Applications in Technology 60 (3), 203-214, 2019
352019
Multi-objective symbiotic organisms optimization for making time-cost tradeoffs in repetitive project scheduling problem
DH Tran, JS Chou, DL Luong
Journal of Civil Engineering and Management 25 (4), 322-339, 2019
342019
Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms
DH Tran, JS Chou, DL Luong
Operational Research 22 (1), 77-103, 2022
152022
The development of a decision support model for eco-friendly material selection in Vietnam
AD Pham, QT Nguyen, DL Luong, QC Truong
Sustainability 12 (7), 2769, 2020
152020
Building a decision-making support framework for installing solar panels on vertical glazing façades of the building based on the life cycle assessment and environmental …
DL Luong, QT Nguyen, AD Pham, QC Truong, MQ Duong
Energies 13 (9), 2376, 2020
122020
Solving the Resource-Constrained Project Scheduling Problem by Genetic Algorithm (< Special English Issue> Global Supply Chain Management)
LD Long, A Ohsato
Journal of Japan Industrial Management Association 57 (6), 520-529, 2007
102007
An AI-driven model for predicting and optimizing energy-efficient building envelopes
LD Long
Alexandria Engineering Journal 79, 480-501, 2023
62023
Developing an optimization model of solar cell installation on building façades in high-rise buildings–A case study in Viet Nam
QT Nguyen, DL Luong, AD Pham, QC Truong
GMSARN Int. J 15 (1), 44-49, 2021
52021
Project schedule management using a fuzzy activity network considering resource and environmental factors
LD Long, A Ohsato
Journal of Japan Industrial Management Association 57 (4), 261-271, 2006
52006
Bilateral negotiation model for intelligent decision-making under uncertainty
PVH Son, SS Leu, LD Long
International Journal of Computer Applications in Technology 54 (2), 89-95, 2016
42016
BIM to BEM transition for optimizing envelope design selection to enhance building energy efficiency and Cost-Effectiveness
NS Truong, DL Luong, QT Nguyen
Energies 16 (10), 3976, 2023
32023
Enhancing Building Energy Efficiency with Aluminum Composite Material Facade: A Performance Simulation Study using Building Energy Modeling and Building Information Modeling
DL Luong, NS Truong, NT Ngo, QT Nguyen
IOP Conference Series: Materials Science and Engineering 1289 (1), 012040, 2023
22023
Fuzzy Activity Network Method for Project Scheduling Under Resource Constraints.
LD Long, A Ohsato
J. Adv. Comput. Intell. Intell. Informatics 11 (8), 914-921, 2007
12007
An optimization method for determining activity durations in project scheduling management
LL Duc
The papers of Technical Meeting on Information Systems, IEE Japan, 2005
12005