Rare earth elements in the international economic scenario CEA Ortiz, EM Viana Júnior Rem: Revista Escola de Minas 67, 361-366, 2014 | 17 | 2014 |
Direct block scheduling technology: Analysis of Avidity FR Souza, HR Burgarelli, AS Nader, CEA Ortiz, LS Chaves, LA Carvalho, ... REM-International Engineering Journal 71, 97-104, 2018 | 14 | 2018 |
Application of optimized models through direct block scheduling in traditional mine planning PHA Campos, CE Arroyo, N Morales Journal of the Southern African Institute of Mining and Metallurgy 118 (4 …, 2018 | 11 | 2018 |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project PHA Campos, IE Cabral, CEA Ortiz, N Morales REM-International Engineering Journal 71, 269-274, 2018 | 11 | 2018 |
Direct block scheduling under marketing uncertainties HR Burgarelli, FR Souza, AS Nader, VFN Torres, TR Câmara, CEA Ortiz, ... REM-International Engineering Journal 71, 275-280, 2018 | 9 | 2018 |
Direct stockpile scheduling: Mathematical formulation F Souza, LS Chaves, H Burgarelli, A Nader, C Arroyo, L Alberto Dyna 85 (204), 296-301, 2018 | 8 | 2018 |
Truck-and-loader versus conveyor belt system: an environmental and economic comparison CM De Almeida, T de Castro Neves, C Arroyo, P Campos Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | 6 | 2019 |
Dimensionamiento de flota en las operaciones de carguío y transporte usando modelos de simulación de sistemas OL de Noronha, AEC Nuñez, AF Dos Reis, CEA Ortiz Interfases, 43-55, 2018 | 6 | 2018 |
Tratamiento de la gingivoestomatitis herpetica-estudio doble ciego entre ribavirin y placebo S Esper-Dib, I Scholz, C Arroyo Sem Med 92, 245-250, 1977 | 6 | 1977 |
Analysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques LS Chaves, LA Carvalho, FR Souza, B Nader, CEA Ortiz, VFN Torres, ... REM-International Engineering Journal 73, 119-126, 2019 | 5 | 2019 |
Classical and stochastic mine planning techniques, state of the art and trends VFN Torres, B Nader, CEA Ortiz, FR Souza, HR Burgarelli, LS Chaves, ... REM-International Engineering Journal 71, 289-297, 2018 | 5 | 2018 |
The use of simulation in fleet selection and equipment sizing in mining CEA Ortiz, A Curi, PH Campos Mine Planning and Equipment Selection: Proceedings of the 22nd MPES …, 2014 | 5 | 2014 |
Impact of bulk density estimation in mine planning C Reis, C Arroyo, A Curi, M Zangrandi Mining Technology 130 (1), 60-65, 2021 | 4 | 2021 |
Environmental and operational benefits through implementing a fleet management system in mining industry. WS Felsch Junior, CE Arroyo Ortiz, A Curi, DR Gonçalves, AA Pinto | 4 | 2020 |
Beneficios de la implementación de un sistema de telemetría para la gestión de las operaciones mineras WSF Junior, CEA Ortiz, V de Souza Oliveira, PRV Da Cunha, ÉFDA Costa Interfases, 87-102, 2018 | 4 | 2018 |
Green hydrogen: Decarbonization in mining-review RL Figueiredo, JM da Silva, CEA Ortiz Cleaner Energy Systems, 100075, 2023 | 3 | 2023 |
Geostatistical analyses applied to estimating geotechnical parameters–study case: Córrego do Sítio Mine YC Vilca, CEA Ortiz, MS Lana, FC Pereira, RLP Canabrava, SS Chaves, ... ISRM Congress, ISRM-14CONGRESS-2019-356, 2019 | 3 | 2019 |
The use of simulation in fleet selection and equipment sizing in mining CE Arroyo Ortiz, A Curi, PH Campos Dresden. Singhal, R. and Drebensted, C.(eds.): 22th Mine planning and …, 2013 | 3 | 2013 |
Non-deterministic load and dump behaviour in mining haul trucks: a case of study RC Barbosa, CEA Ortiz, A Curi Mining Technology 130 (3), 188-194, 2021 | 2 | 2021 |
Caracterização geometalúrgica e modelagem geoestatística da Mina de Brucutu–Quadrilátero Ferrífero (MG). CE Arroyo Ortiz | 2 | 2014 |