Follow
Joshua Prakash
Joshua Prakash
Assistant Professor, Universiti Tunku Abdul Rahman
Verified email at utar.edu.my
Title
Cited by
Cited by
Year
Modified CONWIP systems: a review and classification
J Prakash, JF Chin
Production Planning & Control 26 (4), 296-307, 2015
602015
An integrated OEE framework for structured productivity improvement in a semiconductor manufacturing facility
CK Cheah, J Prakash, KS Ong
International Journal of Productivity and Performance Management 69 (5 …, 2020
482020
Reducing electronic component losses in lean electronics assembly with Six Sigma approach
T Ping Yi, C Jeng Feng, J Prakash, L Wei Ping
International Journal of Lean Six Sigma 3 (3), 206-230, 2012
302012
Overall equipment effectiveness: a review and development of an integrated improvement framework
CK Cheah, J Prakash, KS Ong
International Journal of Productivity and Quality Management 30 (1), 46-71, 2020
252020
A comparison of push and pull production controls under machine breakdown
J Prakash, JF Chin
International Journal of Business Science & Applied Management (IJBSAM) 6 (3 …, 2011
232011
Fundamental simulation studies of CONWIP in front-end wafer fabrication
NA Muhammad, JF Chin, S Kamarrudin, MA Chik, J Prakash
Journal of Industrial and Production Engineering 32 (4), 232-246, 2015
192015
PARALLEL KANBAN-CONWIP SYSTEM FOR BATCH PRODUCTION IN ELECTRONICS ASSEMBLY.
MY Chong, J Prakash, SL Ng, R Ramli, JF Chin
International journal of industrial engineering 20, 2013
182013
Implementation of hybrid parallel kanban-CONWIP system: A case study
J Prakash, JF Chin
Cogent Engineering 1 (1), 938922, 2014
152014
Deployment of operational performance indicators in failure mode effect and analysis application: a literature review and classification
CF Liew, J Prakash, KS Ong
International Journal of Productivity and Quality Management 25 (2), 262-283, 2018
112018
Effects of inventory classifications on CONWIP system: a case study
J Prakash, JF Chin
Journal of Management Analytics 4 (3), 296-320, 2017
92017
Deployment of an FMEA-Integrated Framework to Improve Operational Performance in Semiconductor Manufacturing: A Case Study
CF Liew, J Prakash, S Kamaruddin, KS Ong
IOP Conference Series: Materials Science and Engineering 530 (1), 012040, 2019
62019
An FMEA-based integrated framework to quantify and improve operational performance in advanced manufacturing environments: a case study
CF Liew, J Prakash, KS Ong
International Journal of Productivity and Quality Management 28 (3), 318-339, 2019
62019
Comparison between production controls in multi-stage multi-product manufacturing environments: two case studies
J Prakash, JF Chin
Production & Manufacturing Research 2 (1), 477-500, 2014
62014
Parallel CONWIP for a high-mix multi-stage production system with entrance of rework
J Prakash, MY Chong, SA Mustafa, JF Chin
Journal of Production Research and Management 1 (2), 1-23, 2011
62011
Variation of CONWIP systems
J Prakash, CJ Feng
International Journal of Mechanical and Mechatronics Engineering 6 (12 …, 2012
52012
Parallel kanban-CONWIP for production system with rework entrance
MY Chong, SA Mustafa, J Prakash, JF Chin
International Journal of Manufacturing Research 8 (4), 357-377, 2013
42013
Automating computer simulation and statistical analysis in production planning and control research
MCL 13. Chin, J.F., Prakash, J., Kamaruddin, S., and Tan
International Journal of Computers and Applications, 1-17, 2017
3*2017
Development and validation of an equipment cost efficiency framework for integrating financial and operational performance assessment in manufacturing: a case study
CF Liew, J Prakash, KS Ong
International Journal of Productivity and Quality Management 38 (3), 388-412, 2023
22023
Integration of financial performance measure with overall equipment effectiveness for assessing operational performance: a structured literature review
CF Liew, J Prakash, KS Ong
International Journal of Productivity and Quality Management 37 (1), 119-142, 2022
22022
Performance study of parallel kanban-base stock for a high-mix multi-stage production system with the entrance of rework
SA Mustafa, J Prakash, CM Yong, CJ Feng
International Journal of Advanced Operations Management 6 (3), 227-253, 2014
22014
The system can't perform the operation now. Try again later.
Articles 1–20