Construction safety risk drivers: A BIM approach H Malekitabar, A Ardeshir, MH Sebt, R Stouffs Safety science 82, 445-455, 2016 | 177 | 2016 |
Competency-based selection and assignment of human resources to construction projects V Shahhosseini, MH Sebt Scientia Iranica 18 (2), 163-180, 2011 | 168 | 2011 |
Prediction of bond strength of spliced steel bars in concrete using artificial neural network and fuzzy logic EM Golafshani, A Rahai, MH Sebt, H Akbarpour Construction and building materials 36, 411-418, 2012 | 132 | 2012 |
Computing with words for hierarchical competency based selection of personnel in construction companies SS Gilan, MH Sebt, V Shahhosseini Applied Soft Computing 12 (2), 860-871, 2012 | 95 | 2012 |
Artificial neural network and genetic programming for predicting the bond strength of GFRP bars in concrete EM Golafshani, A Rahai, MH Sebt Materials and structures 48, 1581-1602, 2015 | 86 | 2015 |
Bond behavior of steel and GFRP bars in self-compacting concrete EM Golafshani, A Rahai, MH Sebt Construction and Building Materials 61, 230-240, 2014 | 72 | 2014 |
A type-2 fuzzy set model for contractor prequalification MR Afshar, Y Alipouri, MH Sebt, WT Chan Automation in Construction 84, 356-366, 2017 | 56 | 2017 |
Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem MH Sebt, MR Afshar, Y Alipouri Engineering Optimization 49 (3), 513-530, 2017 | 50 | 2017 |
Potential application of GIS to layout of construction temporary facilities MH Sebt, KE PARVARESH, MR Delavar International Journal of Civil Engineering 6 (4), 235-245, 2008 | 36 | 2008 |
A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem Y Alipouri, MH Sebt, A Ardeshir, MHF Zarandi Operational Research 20, 197-217, 2020 | 34 | 2020 |
Characteristics of the construction industry from the marketing viewpoint: Challenges and solutions M Mokhtariani, MH Sebt, H Davoudpour Civil engineering journal 3 (9), 701-714, 2017 | 31 | 2017 |
Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach Y Alipouri, MH Sebt, A Ardeshir, WT Chan Journal of the Operational Research Society 70 (3), 403-419, 2019 | 26 | 2019 |
Solving resource-constrained project scheduling problem with evolutionary programming MH Sebt, Y Alipouri, Y Alipouri Journal of the Operational Research Society 64, 1327-1335, 2013 | 25 | 2013 |
Construction marketing: developing a reference framework M Mokhtariani, MH Sebt, H Davoudpour Advances in Civil Engineering 2017, 2017 | 23 | 2017 |
An Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation MH Sebt, MR Afshar, Y Alipouri International Journal of Supply and Operations Management 2 (3), 905-924, 2015 | 22 | 2015 |
Multi-objective optimization of dynamic construction site layout using BIM and GIS M Zavari, V Shahhosseini, A Ardeshir, MH Sebt Journal of Building Engineering 52, 104518, 2022 | 20 | 2022 |
Competency based optimized assignment of project managers to projects MH Sebt, V Shahhosseini, M Rezaei 2010 12th International Conference on Computer Modelling and Simulation, 311-316, 2010 | 20 | 2010 |
The optimal TADAS damper placement in moment resisting steel structures based on a cost-benefit analysis MH Sebt, A Yousefzadeh, M Tehranizadeh International Journal of Civil Engineering 9 (1), 23-32, 2011 | 19 | 2011 |
A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem MR Afshar, V Shahhosseini, MH Sebt International Journal of Construction Management 22 (3), 357-365, 2022 | 18 | 2022 |
Exploring critical success factors in urban housing projects using fuzzy analytic network process H Youneszadeh, A Ardeshir, MH Sebt Civil Engineering Journal 3 (11), 1048-1067, 2017 | 16 | 2017 |