Follow
F.J. Hwang
Title
Cited by
Cited by
Year
A probability density function generator based on neural networks
CH Chen, F Song, FJ Hwang, L Wu
Physica A: Statistical Mechanics and Its Applications 541, 123344, 2020
1192020
Travel time prediction system based on data clustering for waste collection vehicles
CH Chen, FJ Hwang, HY Kung
IEICE TRANSACTIONS on Information and Systems 102 (7), 1374-1383, 2019
1022019
Parallel and distributed architecture of genetic algorithm on Apache Hadoop and Spark
HC Lu, FJ Hwang, YH Huang
Applied Soft Computing 95, 106497, 2020
382020
An effective placement method for the single container loading problem
YH Huang, FJ Hwang, HC Lu
Computers & Industrial Engineering 97, 212-221, 2016
372016
Makespan minimization for the m-machine ordered flow shop scheduling problem
M Khatami, A Salehipour, FJ Hwang
Computers & Operations Research 111, 400-414, 2019
322019
Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type
BMT Lin, FJ Hwang
Information Processing Letters 111 (5), 208-212, 2011
272011
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
FJ Hwang, BMT Lin
Journal of the Operational Research Society 63 (6), 839-845, 2012
242012
Coupled-task scheduling on a single machine subject to a fixed-job-sequence
FJ Hwang, BMT Lin
Computers & Industrial Engineering 60 (4), 690-698, 2011
212011
Energy-efficient single-machine scheduling problem with controllable job processing times under differential electricity pricing
YC Tsao, VV Thanh, FJ Hwang
Resources, Conservation and Recycling 161, 104902, 2020
172020
Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
FJ Hwang, BMT Lin
Computers & Operations Research 98, 103-112, 2018
172018
Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
FJ Hwang, MY Kovalyov, BMT Lin
Annals of Operations Research 217, 263-279, 2014
172014
Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
FJ Hwang, MY Kovalyov, BMT Lin
Discrete Optimization 9 (1), 29-39, 2012
152012
Global optimization for the three-dimensional open-dimension rectangular packing problem
YH Huang, FJ Hwang
Engineering Optimization 50 (10), 1789-1809, 2018
112018
Relocation scheduling subject to fixed processing sequences
BMT Lin, FJ Hwang, AV Kononov
Journal of Scheduling 19, 153-163, 2016
112016
Spatial heterogeneity and migration characteristics of traffic congestion—A quantitative identification method based on taxi trajectory data
X Fu, C Xu, Y Liu, CH Chen, FJ Hwang, J Wang
Physica A: Statistical Mechanics and its Applications 588, 126482, 2022
102022
Northeast passage in Asia-Europe liner shipping: an economic and environmental assessment
PH Tseng, A Zhou, FJ Hwang
International Journal of Sustainable Transportation 15 (4), 273-284, 2021
92021
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
BMT Lin, FJ Hwang, JND Gupta
Journal of Scheduling 20, 293-302, 2017
82017
Two-stage flexible flow shop scheduling subject to fixed job sequences
FJ Hwang, BMT Lin
Journal of the Operational Research Society 67 (3), 506-515, 2016
82016
Bi-criteria sequencing of courses and formation of classes for a bottleneck classroom
OG Czibula, H Gu, FJ Hwang, MY Kovalyov, Y Zinder
Computers & Operations Research 65, 53-63, 2016
72016
Fast Spatiotemporal Learning Framework for Traffic Flow Forecasting
C Guo, CH Chen, FJ Hwang, CC Chang, CC Chang
IEEE Transactions on Intelligent Transportation Systems, 2023
42023
The system can't perform the operation now. Try again later.
Articles 1–20