Multiple regression, ANN and ANFIS models for prediction of backbreak in the open pit blasting M Esmaeili, M Osanloo, F Rashidinejad, A Aghajani Bazzazi, M Taji Engineering with computers 30, 549-558, 2014 | 113 | 2014 |
Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits M Osanloo, F Rashidinejad, B Rezai Resources Policy 33 (4), 222-229, 2008 | 80 | 2008 |
Influence of Sungun copper mine on groundwater quality, NW Iran T Nasrabadi, GR Nabi Bidhendi, AR Karbassi, H Hoveidi, I Nasrabadi, ... Environmental Geology 58, 693-700, 2009 | 62 | 2009 |
Application of fuzzy multi-attribute decision-making to select and to rank the post-mining land-use I Masoumi, S Naraghi, F Rashidi-nejad, S Masoumi Environmental earth sciences 72, 221-231, 2014 | 60 | 2014 |
An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage F Rashidinejad, M Osanloo, B Rezai International Journal of Environmental Science & Technology 5, 183-194, 2008 | 60 | 2008 |
Prediction of penetration rate of rotary percussive drilling using artificial neural networks – A case study F Aalizad, Ali, Rashidinejad Archives of Mining Science 57 (3), 615-628, 2012 | 54* | 2012 |
Cutoff grades optimization with environmental management; a case study: Sungun copper project F RASHIDINEZHAD, M OSANLOU, B REZAEI INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE (ENGLISH) 19 (15), 1-13, 2008 | 23 | 2008 |
Preference ranking of post mining land-use through LIMA framework I Masoumi, F Rashidinejad 9th international conference on Clean Technologies for the Mining Industry, 1-16, 2011 | 11 | 2011 |
Tailings disposal options study at Sungun copper mine F RASHIDINEZHAD, SF RAOUF PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON MINE PLANNING AND EQUIPMENT …, 2004 | 8 | 2004 |
Open pit or block caving? A numerical ranking method for selection F Rashidi-Nejad, FT Suorineni, B Asi Journal of The South African Institute of Mining and Metallurgy 114, 183-199, 2014 | 6 | 2014 |
Tailings Disposal Options Study for Sangan Iron Mine Project, Iran F Rashidinejad, N Saeed Tailings and Mine Waste, 757-770, 2011 | 4 | 2011 |
Optimization of tailings disposal method using fuzzy analytic hierarchy process S Naraghi, I Masoumi, F Rashidinejad Water Supply 19 (5), 1563-1571, 2019 | 3 | 2019 |
Compare methods of fix lead, Milawa NPV and Milawa balance algorithm in optimizing the production of open pit mines with whittel software S Jamalan, F Rashidinejad Open Journal of Geology 7 (5), 603-607, 2017 | 3 | 2017 |
Optimization of firing system utilizing fuzzy MADM method-case study: Gravel mine project in Gotvand Olya dam–Iran H Kamali-Bandpey, H Alinejad-Rokny, H Khanbabapour, F Rashidinejad Australian Journal of Basic and Applied Sciences 5 (12), 1089-1097, 2011 | 3 | 2011 |
A prototype holistic cut-off grade model for porphyry coppers F RASHIDINEZHAD, M OSANLOU, B Rezai, B Asi PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON ENVIRONMENTAL ISSUES AND WASTE …, 2007 | 3 | 2007 |
SWOT Analysis of the Iranian Copper Industry F Rashidinejad, B Asi International Copper Ore Mining Congress, 1-9, 2012 | 2 | 2012 |
Evaluation of Sungun copper mine design M Heidari, F Rashidinejad Proceedings of the 13th International Symposium on Mine Planning and …, 2004 | 2 | 2004 |
Sungun copper project environmental impact assessment F Rashidinejad Proceedings of the 8th. International symposium on environmental issues and …, 2004 | 2 | 2004 |
of retracted article: Compare Methods of Fix Lead, Milawa NPV and Milawa Balance S Jamalan, F Rashidinejad Open Journal of Geology 7, 2017 | | 2017 |
Sustainable tailings management F Rashidinejad, B Asi Cuprum: czasopismo naukowo-techniczne górnictwa rud, 63-74, 2012 | | 2012 |