WLHM Desa
WLHM Desa
Senior Lecturer of Decision Science, Universiti Utara Malaysia
Verified email at uum.edu.my
Title
Cited by
Cited by
Year
Evaluating the performance of a multipart production system using discrete event simulation (DES)
WLHM Desa, S Kamaruddin, MKM Nawawi, R Khalid
International Proceedings of Economics Development and Research 63, 64, 2013
52013
Modeling of aircraft composite parts using simulation
WLHM Desa, S Kamaruddin, MKM Nawawi
Advanced Materials Research 591, 557-560, 2012
22012
A fuzzy rule-based expert system for asthma severity identification in emergency department
NAM Sharif, N Ahmad, N Ahmad, WLHM Desa, KM Helmy, WC Ang, ...
Journal of Information and Communication Technology 18 (4), 415-438, 2019
12019
Green supply chain: Simulating road traffic congestion
MZHA Jalal, MKM Nawawi, W Laailatul Hanim Mat Desa, R Khalid, ...
JPhCS 890 (1), 012111, 2017
12017
Greedy method for solving the Langkawi tourist route: A case study
Z Hashim, WLHM Desa, HA Aziz, NMZBINM Zaki
Journal of Technology and Operations Management 13 (1), 21-29, 2018
2018
Minimizing the maintenance costs of shuttle bus services using iterative heuristic
WLHM Desa, A Alwi, GS Lynn, SJ Wen
2018
Solving an optimal route for tourist at Langkawi using heuristics technique
Z Hashim, WLH Mat Desa, HA Aziz, NMZ Mohd Zaki
2018
Investigating the appointment scheduling system at dental clinic using greedy heuristics
WLHM Desa, RA Rahman, LY Hwei, YC Fung
Journal of Technology Management and Business 5 (3), 2018
2018
Discrete-Event Simulation of Road Traffic Congestion to Support Green Supply Chain
MZH Abd Jalal, WLHM Desa, MKM Nawawi, R Khalid
International Journal of Engineering & Technology 7 (3.20), 377-380, 2018
2018
Greedy method for solvingthe langkawi touristroute: a case study
Z Hashim, WLH Mat Desa, HA Aziz, NMZ Mohd Zaki
2018
Acute asthma severity identification of expert system flow in emergency department
NAM Sharif, N Ahmad, N Ahmad, WLHM Desa
AIP Conference Proceedings 1905 (1), 040027, 2017
2017
Green supply chain: Simulating road traffic congestion
MZH Abd Jalal, MKM Nawawi, WLHM Desa, R Khalid, WK Abduljabbar, ...
Journal of Physics: Conference Series 890 (1), 012111, 2017
2017
Evaluation on Absenteeism Effect in Production Line at Aircraft Composite Manufacturer
WLHM Desa, S Kamaruddin, MKM Nawawi, J Zulkepli
Jurnal Teknologi (Sciences & Engineering) 77 (5), 63–67, 2015
2015
Computer Simulation Modelling in Aircraft’s Composite Parts Manufacturing
WLHM Desa, S Kamaruddin, MKM Nawawi
Proceeding of Mechanical & Aerospace Engineering Postgraduate Colloquium …, 2012
2012
Kecekapan operasi farmasi pesakit luar di Hospital Alor Setar menggunakan model simulasi
WLHM Desa, A Alwi, Z Hashim
Jurnal Karya Asli Lorekan Ahli Matematik (KALAM) 1 (1), 75-81, 2007
2007
Evaluating Performance and Cost of Production Using Optimum-seeking Simulation: A Case Study at an Aircraft Parts Manufacturer
MKM Nawawi, WLHM Desa, SHM Radzi
Fakulti Sains Kuantitatif, Universiti Utara Malaysia, 2005
2005
Simulation Modeling of Footwear Production
WLHM Desa, RM Tahar
Proceeding of the 2005 National Seminar on Engineering Support Cources …, 2005
2005
Evaluating Performance of Footwear Production System Using Simulation
WLHM Desa, RM Tahar
Journal of the Science Faculty of Chiang Mai University 32 (2), 97-108, 2005
2005
The system can't perform the operation now. Try again later.
Articles 1–18