Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs S Thiagarajan, C Rajendran Computers & Industrial Engineering 49 (4), 463-503, 2005 | 121 | 2005 |
Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs S Thiagarajan, C Rajendran International Journal of Production Research 41 (18), 4453-4486, 2003 | 48 | 2003 |
Generating non-permutation schedules in flowline-based manufacturing sytems with sequence-dependent setup times of jobs: a heuristic approach S Pugazhendhi, S Thiagarajan, C Rajendran, N Anantharaman The International Journal of Advanced Manufacturing Technology 23 (1), 64-78, 2004 | 40 | 2004 |
Performance enhancement by using non-permutation schedules in flowline-based manufacturing systems S Pugazhendhi, S Thiagarajan, C Rajendran, N Anantharaman Computers & Industrial Engineering 44 (1), 133-157, 2003 | 36 | 2003 |
Relative performance evaluation of permutation and non-permutation schedules in flowline-based manufacturing systems with flowtime objective S Pugazhendhi, S Thiagarajan, C Rajendran, N Anantharaman The International Journal of Advanced Manufacturing Technology 23 (11), 820-830, 2004 | 16 | 2004 |
Simulated annealing algorithms to minimise the completion time variance of jobs in permutation flowshops J Krishnaraj, S Pugazhendhi, C Rajendran, S Thiagarajan International Journal of Industrial and Systems Engineering 31 (4), 425-451, 2019 | 10 | 2019 |
A modified ant-colony optimisation algorithm to minimise the completion time variance of jobs in flowshops J Krishnaraj, S Pugazhendhi, C Rajendran, S Thiagarajan International journal of production research 50 (20), 5698-5706, 2012 | 7 | 2012 |
A heuristic algorithm to minimise the total flowtime of jobs in permutation flowshops J Krishnaraj, S Pugazhendhi, C Rajendran, S Thiagarajan International Journal of Industrial and Systems Engineering 17 (4), 511-532, 2014 | 5 | 2014 |
A two-phase simulated annealing algorithm to minimise the completion time variance of jobs in flowshops J Krishnaraj, S Thiagarajan International Journal of Process Management and Benchmarking 10 (2), 261-281, 2020 | 1 | 2020 |
Incorporation of customer priorities in scheduling decisions in manufacturing systems S Thiagarajan, C Rajendran Logistics and Supply Chain Management, 66, 2001 | | 2001 |